Klarifi Logo
Try for freeLog in
Klarifi Logo

Davenport, Iowa: water and wastewater capital improvement projects

17 line items · $81M · starting 2026–2030 · 1 plan

Davenport's published capital plans list 17 water, sewer and wastewater line items with a combined planning budget of $81M, of which 17 items worth $81M sit in the wastewater and sewer departments. The largest single item is WPCP | Digester Rehabilitation Project at $27M (2026–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Davenport

The 10 largest water, sewer and wastewater line items in Davenport’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WPCP | Digester Rehabilitation ProjectWastewaterAnaerobic digesters and biogas$27M2026–2028
2Sewer Rehabilitation ProgramSewerSewer rehabilitation and I&I$17M2026–2031
3Sanitary Sewer Repair ProgramSewerSewer rehabilitation and I&I$8M2026–2031
4SSES ProgramSewerSewer rehabilitation and I&I$7M2026–2031
5Sewer Lateral Repair ProgramSewerSewer rehabilitation and I&I$7M2026–2031
6WPCP | Influent Bar Screen ReplacementWastewaterHeadworks, screening and grit$5M2026
7WPCP | Clarifier Drive Repair & ReplacementWastewaterClarifiers and settling$2M2026–2027
8Sanitary Sewer | Iowa StreetSewerSewer rehabilitation and I&I$2M2029–2030
9WPCP | Lift Station Wet Well InspectionWastewaterLift stations$923K2029
10WPCP | Aeration Basin RehabilitationWastewaterAeration and blowers$875K2026–2031

7 more line items in Davenport, with descriptions and contacts

Klarifi holds every Davenport line item with its description, the page it appears on and the source document, plus 43 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$76M

11 items

2027

$225K

1 items

2029

$2M

2 items

2030

$2M

3 items

By department

Line items and planning budgets by department, Davenport.
DepartmentLine itemsBudgetShare
Wastewater9$39M48%
Sewer8$42M52%

Project types in Davenport's plan

Wastewater treatment plants in Davenport

2 publicly owned treatment plants in Davenport with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Davenport, City Of-West Locust LagoonIA00762612
Davenport Wastewater Treatment PlantIA00430520

Other Iowa cities with capital plans

Davenport capital plan questions

Sources and methodology

Budgets and years are as published in Davenport’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: Adopted Budget 2023–2026 (17 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free