Storm Lake, Iowa: water and wastewater capital improvement projects

55 line items · $132M · starting 2026–2030 · 1 plan

Storm Lake's published capital plans list 55 water, sewer and wastewater line items with a combined planning budget of $132M, of which 34 items worth $12M sit in the wastewater and sewer departments. The largest single item is Water Plant Expansion Design at $103M (2028–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Storm Lake

The 10 largest water, sewer and wastewater line items in Storm Lake’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water Plant Expansion DesignWater SupplyWastewater treatment plant upgrades$103M2028–2030
2Jordan Well (New Well 25)Water SupplyWells and groundwater$6M2027–2028
3Well 15 Replacement (New Well 22)Water SupplyWells and groundwater$2M2026
4Shallow Well (New Well 24)Water SupplyWells and groundwater$2M2028–2029
5Emerald Park LS ReplacementWastewaterLift stations$1M2027–2028
6Tower 1 RemovalWater Supply$1M2027
71st Street CIPPSewerSewer rehabilitation and I&I$1M2027–2028
8Golf Course LS ReplacementWastewaterLift stations$1M2029–2030
9Well RehabWater SupplyWells and groundwater$1M2026–2030
10Tower 2 RecoatingWater SupplyBuildings, HVAC and site work$1M2026

45 more line items in Storm Lake, with descriptions and contacts

Klarifi holds every Storm Lake line item with its description, the page it appears on and the source document, plus 15 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$8M

13 items

2027

$14M

21 items

2028

$106M

8 items

2029

$3M

9 items

2030

$580K

4 items

By department

Line items and planning budgets by department, Storm Lake.
DepartmentLine itemsBudgetShare
Wastewater29$10M7%
Sewer5$3M2%
Water Supply14$118M89%
Water Distribution7$3M2%

Project types in Storm Lake's plan

Wastewater treatment plants in Storm Lake

1 publicly owned treatment plant in Storm Lake with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Storm Lake WWTPIA00324843

Other Iowa cities with capital plans

Storm Lake capital plan questions

Sources and methodology

Budgets and years are as published in Storm Lake’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (55 line items).

Data refreshed September 11, 2026.