35 line items · $26M · starting 2026–2027 · 1 plan
Lakeville's published capital plans list 35 water, sewer and wastewater line items with a combined planning budget of $26M, of which 18 items worth $14M sit in the wastewater and sewer departments. The largest single item is Sanitary Sewer Inflow/Infiltration Maintenance at $3M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Sanitary Sewer Inflow/Infiltration Maintenance | Sewer | Membranes and filtration | $3M | 2025–2029 |
| 2 | Sanitary Sewer Inflow/Infiltration Repairs | Sewer | Membranes and filtration | $3M | 2025–2029 |
| 3 | Watermain Replacement/Repair (XX-02 Street Reconstruction project) | Water Distribution | Water mains and distribution | $3M | 2025–2029 |
| 4 | Lift Station #26/Crystal Lake Lift Station | Sewer | Lift stations | $2M | 2025 |
| 5 | Sanitary Sewer Trunk Fund - Fees | Sewer | Sewer rehabilitation and I&I | $2M | 2025 |
| 6 | Well Construction | Water Supply | Wells and groundwater | $2M | 2027–2028 |
| 7 | Water Meter Replacement | Water Distribution | Meters and AMI | $1M | 2025–2029 |
| 8 | Watermain Trunk Extensions | Water Distribution | Water mains and distribution | $1M | 2025–2029 |
| 9 | Sanitary Sewer Rehabilitation (XX-02 Street Reconstruction project) | Sewer | Sewer rehabilitation and I&I | $1M | 2025–2029 |
| 10 | Tower and Reservoir Maintenance | Water Supply | Storage tanks and reservoirs | $1M | 2026–2029 |
25 more line items in Lakeville, with descriptions and contacts
Klarifi holds every Lakeville line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$22M
24 items
2026
$2M
3 items
2027
$2M
8 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 18 | $14M | 54% |
| Water Supply | 4 | $4M | 16% |
| Water Distribution | 13 | $8M | 29% |
1 publicly owned treatment plant in Lakeville. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Silver Lake WWTP | — | MNG585164 | 0 |
Sources and methodology
Budgets and years are as published in Lakeville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (35 line items).
Data refreshed September 11, 2026.