28 line items · $14M · starting 2026–2030 · 1 plan
Shakopee's published capital plans list 28 water, sewer and wastewater line items with a combined planning budget of $14M, of which 28 items worth $14M sit in the wastewater and sewer departments. The largest single item is Trunk Sewer Extensions at $3M (2025–2039). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Trunk Sewer Extensions | Sewer | Force mains and interceptors | $3M | 2025–2039 |
| 2 | L16 Dual Forcemain Improvements | Sewer | Force mains and interceptors | $3M | 2025–2029 |
| 3 | L16 Forcemain Lining | Sewer | Force mains and interceptors | $2M | 2030 |
| 4 | West End (High Bluff) Lift Station | Sewer | Lift stations | $1M | 2030 |
| 5 | Jetter Truck (Freightliner) | Sewer | Vehicles and equipment | $626K | 2037 |
| 6 | Lift Station 16 Rehab | Sewer | Lift stations | $515K | 2035 |
| 7 | SCADA System Upgrade | Sewer | SCADA, controls and instrumentation | $500K | 2030 |
| 8 | Sewer Jetter Replacement | Sewer | Sewer rehabilitation and I&I | $450K | 2028 |
| 9 | CSAH 83/TH 169 Trunk Sewer Crossing Expansion | Sewer | Force mains and interceptors | $410K | 2034 |
| 10 | Cured In Place Sewer Pipe Lining | Sewer | Sewer rehabilitation and I&I | $400K | 2034 |
18 more line items in Shakopee, with descriptions and contacts
Klarifi holds every Shakopee line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$6M
4 items
2026
$123K
1 items
2028
$456K
2 items
2029
$187K
1 items
2030
$4M
10 items
2032 and later
$3M
10 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 28 | $14M | 100% |
1 publicly owned treatment plant in Shakopee. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Blue Lake Wastewater Treatment Plant | 26.54 | MN0029882 | 0 |
Sources and methodology
Budgets and years are as published in Shakopee’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (28 line items).
Data refreshed September 11, 2026.