Missoula, Montana: water and wastewater capital improvement projects

46 line items · $152M · starting 2026 · 1 plan

Missoula's published capital plans list 46 water, sewer and wastewater line items with a combined planning budget of $152M, of which 28 items worth $70M sit in the wastewater and sewer departments. The largest single item is 2026 Water Distribution CIP at $56M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Missoula

The 10 largest water, sewer and wastewater line items in Missoula’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
12026 Water Distribution CIPWater DistributionWater mains and distribution$56M2026–2030
2Sewer Main RehabilitationWastewaterSewer rehabilitation and I&I$35M2026–2030
3Clark Fork River Sewer CrossingWastewaterSewer rehabilitation and I&I$11M2026–2027
4Broadway Building RemodelWater SupplyBuildings, HVAC and site work$9M2026–2030
5Garden City Compost Phase 2Wastewater$9M2026
6Water Pumps and Pumphouse RehabilitationWater DistributionPump stations$4M2026–2030
7RRF Equipment ReplacementWastewaterVehicles and equipment$3M2026–2030
8Front St (Madison to Van Buren)Water DistributionVehicles and equipment$2M2026
9West End Farms Park Production WellWater DistributionWells and groundwater$2M2026
10Water MetersWater DistributionMeters and AMI$2M2026–2030

36 more line items in Missoula, with descriptions and contacts

Klarifi holds every Missoula line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$152M

46 items

By department

Line items and planning budgets by department, Missoula.
DepartmentLine itemsBudgetShare
Wastewater28$70M46%
Water Supply1$9M6%
Water Distribution17$72M48%

Wastewater treatment plants in Missoula

1 publicly owned treatment plant in Missoula with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
City Of Missoula WWTF No Exposure7.52MT00225947

Other Montana cities with capital plans

Missoula capital plan questions

Sources and methodology

Budgets and years are as published in Missoula’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (46 line items).

Data refreshed September 11, 2026.