46 line items · $152M · starting 2026 · 1 plan
Missoula's published capital plans list 46 water, sewer and wastewater line items with a combined planning budget of $152M, of which 28 items worth $70M sit in the wastewater and sewer departments. The largest single item is 2026 Water Distribution CIP at $56M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | 2026 Water Distribution CIP | Water Distribution | Water mains and distribution | $56M | 2026–2030 |
| 2 | Sewer Main Rehabilitation | Wastewater | Sewer rehabilitation and I&I | $35M | 2026–2030 |
| 3 | Clark Fork River Sewer Crossing | Wastewater | Sewer rehabilitation and I&I | $11M | 2026–2027 |
| 4 | Broadway Building Remodel | Water Supply | Buildings, HVAC and site work | $9M | 2026–2030 |
| 5 | Garden City Compost Phase 2 | Wastewater | — | $9M | 2026 |
| 6 | Water Pumps and Pumphouse Rehabilitation | Water Distribution | Pump stations | $4M | 2026–2030 |
| 7 | RRF Equipment Replacement | Wastewater | Vehicles and equipment | $3M | 2026–2030 |
| 8 | Front St (Madison to Van Buren) | Water Distribution | Vehicles and equipment | $2M | 2026 |
| 9 | West End Farms Park Production Well | Water Distribution | Wells and groundwater | $2M | 2026 |
| 10 | Water Meters | Water Distribution | Meters and AMI | $2M | 2026–2030 |
36 more line items in Missoula, with descriptions and contacts
Klarifi holds every Missoula line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$152M
46 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 28 | $70M | 46% |
| Water Supply | 1 | $9M | 6% |
| Water Distribution | 17 | $72M | 48% |
1 publicly owned treatment plant in Missoula with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| City Of Missoula WWTF No Exposure | 7.52 | MT0022594 | 7 |
Sources and methodology
Budgets and years are as published in Missoula’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (46 line items).
Data refreshed September 11, 2026.