90 line items · $170M · starting 2026–2030 · 1 plan
Bozeman's published capital plans list 90 water, sewer and wastewater line items with a combined planning budget of $170M, of which 56 items worth $70M sit in the wastewater and sewer departments. The largest single item is Lyman Tank & Transmission Main at $18M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Lyman Tank & Transmission Main | Water Distribution | Water mains and distribution | $18M | 2026–2027 |
| 2 | Western Transmission Main / New South Pressure Zone | Water Distribution | Water mains and distribution | $18M | 2029–2030 |
| 3 | Water Reclamation Facility (WRF) Base Hydraulic Phase 2 | Wastewater | Wastewater treatment plant upgrades | $16M | 2026–2028 |
| 4 | Water Pipe Replacement Program | Water Distribution | Water mains and distribution | $15M | 2026–2030 |
| 5 | Gooch Hill Lift Station | Wastewater | Lift stations | $13M | 2026–2028 |
| 6 | Hyalite Reservoir Equalization Storage | Water Supply | Storage tanks and reservoirs | $10M | 2027–2029 |
| 7 | Municipal Groundwater Public Water Supply & Mitigation System Infrastructure | Water Supply | Wells and groundwater | $10M | 2027–2028 |
| 8 | Annual 6-Inch Wastewater Pipe Replacement | Wastewater | Water mains and distribution | $6M | 2026–2030 |
| 9 | N. Frontage Interceptor | Wastewater | Force mains and interceptors | $6M | 2027–2029 |
| 10 | Hyalite Dam & Reservoir Optimization Improvements | Water Supply | Storage tanks and reservoirs | $5M | 2026–2028 |
80 more line items in Bozeman, with descriptions and contacts
Klarifi holds every Bozeman line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$100M
36 items
2027
$33M
20 items
2028
$9M
13 items
2029
$25M
7 items
2030
$3M
14 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 51 | $70M | 41% |
| Sewer | 5 | $417K | 0% |
| Water Supply | 13 | $39M | 23% |
| Water Distribution | 21 | $61M | 36% |
3 publicly owned treatment plants in Bozeman with 4 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| City Of Bozeman WWTP | 7.35 | MT0022608 | 0 |
| City Of Bozeman - Lyman Creek Reservoir | 0.19 | MT0031631 | 0 |
| Bozeman Water Treatment Plant | 0.13 | MTX000224 | 4 |
Sources and methodology
Budgets and years are as published in Bozeman’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (90 line items).
Data refreshed September 11, 2026.