21 line items · $6M · starting 2026–2029 · 1 plan
Burwell's published capital plans list 21 water, sewer and wastewater line items with a combined planning budget of $6M, of which 3 items worth $1M sit in the wastewater and sewer departments. The largest single item is Upgrade Sewer Mains NE Quadrant at $400K (2027–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Upgrade Sewer Mains NE Quadrant | Sewer | Sewer rehabilitation and I&I | $400K | 2027–2029 |
| 2 | Upgrade Sewer Mains NW Quadrant | Sewer | Sewer rehabilitation and I&I | $400K | 2026–2028 |
| 3 | Upgrade Sewer Mains SE Quadrant | Sewer | Sewer rehabilitation and I&I | $400K | 2026–2029 |
| 4 | South Well Backup Power | Water Supply | Wells and groundwater | $350K | 2027 |
| 5 | Upgrade 4 In Mains (NE Side) to 8 Inch | Water Distribution | Water mains and distribution | $350K | 2028 |
| 6 | Upgrade 4 In Mains (NW Side) to 8 Inch | Water Distribution | Water mains and distribution | $350K | 2028 |
| 7 | Upgrade 4 In Mains (SE Side) to 8 Inch | Water Distribution | Water mains and distribution | $350K | 2029 |
| 8 | Upgrade 4 In Mains (SW Side) to 8 Inch | Water Distribution | Water mains and distribution | $350K | 2029 |
| 9 | West Well Electrical Backup | Water Supply | Wells and groundwater | $350K | 2028 |
| 10 | Upgrade 1 Inch Main to 8 Inch (East Side) | Water Distribution | Water mains and distribution | $250K | 2026 |
11 more line items in Burwell, with descriptions and contacts
Klarifi holds every Burwell line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$850K
5 items
2026
$1M
5 items
2027
$1M
4 items
2028
$1M
3 items
2029
$1M
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 3 | $1M | 22% |
| Water Supply | 5 | $1M | 21% |
| Water Distribution | 13 | $3M | 58% |
1 publicly owned treatment plant in Burwell with 5 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Burwell Wastewater Treatment | 0.08 | NE0021172 | 5 |
Sources and methodology
Budgets and years are as published in Burwell’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (21 line items).
Data refreshed September 11, 2026.