Burwell, Nebraska: water and wastewater capital improvement projects
Water, sewer and wastewater line items in Burwell’s published capital improvement plans and adopted budgets, with budgets, years and the source documents.
- Planned budget
- $6M
- Line items
- 21
- Wastewater and sewer
- $1M
- Starting
- 2026–2029
- Plan
- 1
Burwell's published capital plans list 21 water, sewer and wastewater line items with a combined planning budget of $6M, of which 3 items worth $1M sit in the wastewater and sewer departments. The largest single item is Upgrade Sewer Mains NE Quadrant at $400K (2027–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
The largest water and sewer projects in Burwell
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Upgrade Sewer Mains NE Quadrant | Sewer | Sewer rehabilitation and I&I | $400K | 2027–2029 |
| 2 | Upgrade Sewer Mains NW Quadrant | Sewer | Sewer rehabilitation and I&I | $400K | 2026–2028 |
| 3 | Upgrade Sewer Mains SE Quadrant | Sewer | Sewer rehabilitation and I&I | $400K | 2026–2029 |
| 4 | South Well Backup Power | Water Supply | Wells and groundwater | $350K | 2027 |
| 5 | Upgrade 4 In Mains (NE Side) to 8 Inch | Water Distribution | Water mains and distribution | $350K | 2028 |
| 6 | Upgrade 4 In Mains (NW Side) to 8 Inch | Water Distribution | Water mains and distribution | $350K | 2028 |
| 7 | Upgrade 4 In Mains (SE Side) to 8 Inch | Water Distribution | Water mains and distribution | $350K | 2029 |
| 8 | Upgrade 4 In Mains (SW Side) to 8 Inch | Water Distribution | Water mains and distribution | $350K | 2029 |
| 9 | West Well Electrical Backup | Water Supply | Wells and groundwater | $350K | 2028 |
| 10 | Upgrade 1 Inch Main to 8 Inch (East Side) | Water Distribution | Water mains and distribution | $250K | 2026 |
Planned spend by start year
By department
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 3 | $1M | 22% |
| Water Supply | 5 | $1M | 21% |
| Water Distribution | 13 | $3M | 58% |
Project types in Burwell's plan
- Water mains and distribution13 line items$3M
- Sewer rehabilitation and I&I3 line items$1M
- Wells and groundwater5 line items$1M
Wastewater treatment plants in Burwell
1 publicly owned treatment plant in Burwell with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Burwell Wastewater Treatment | 0.07 | NE0021172 | 3 |
Burwell capital plan questions
How much is Burwell, NE planning to spend on water and sewer infrastructure?
Burwell’s published capital plans list 21 water, sewer and wastewater line items with a combined budget of $6M, of which $1M is in the wastewater and sewer departments.
What is the largest capital project in Burwell’s plan?
Upgrade Sewer Mains NE Quadrant, budgeted at $400K and scheduled for 2027–2029 under the Sewer department.
When do Burwell’s water and sewer projects start?
5 projects ($1M) start in 2026 and 4 projects ($1M) start in 2027. Budgets are as published in the plan and can change at adoption.
How do I find the contacts and full project list for Burwell?
Klarifi holds every line item with its description, page reference and source document. The public page shows the ten largest items; the full list is available with a free trial.