Nebraska water and wastewater capital improvement plans

193 planned projects · $3.7B · 4 cities · 6 plans

The 6 capital improvement plans and adopted budgets Klarifi has extracted for Nebraska list 193 water, sewer and wastewater line items with a combined planning budget of $3.7B across 4 cities. Omaha has the largest plan at $2.2B. Each city page lists its largest projects with budgets and years, links the source document and the city's treatment plants.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

Wastewater plants in NebraskaNebraska NPDES permits →

Cities in Nebraska with water and sewer capital plans

Nebraska cities ranked by the combined planning budget of their water, sewer and wastewater line items.
#CityLine itemsBudgetPlans
1Omaha20$2.2B2
2Lincoln111$1.1B2
3Bellevue41$299M1
4Burwell21$6M1

Planned spend by start year

Before 2026

$3.3B

143 items

2026

$32M

14 items

2027

$30M

10 items

2028

$19M

10 items

2029

$32M

9 items

2030

$14M

3 items

2031

$16M

1 items

2032 and later

$279M

3 items

By department

Line items and planning budgets by utility department, Nebraska.
DepartmentLine itemsBudgetShare
Wastewater67$1.1B31%
Sewer40$1.5B40%
Water Supply49$673M18%
Water Distribution37$414M11%

Project types in Nebraska

Sewer rehabilitation and I&I · 27 · $947MWastewater treatment plant upgrades · 10 · $767MWater mains and distribution · 45 · $479MForce mains and interceptors · 14 · $268MWells and groundwater · 9 · $226MPump stations · 9 · $222MWater treatment plants · 2 · $182MHeadworks, screening and grit · 2 · $98MStormwater and flood resilience · 2 · $92MAeration and blowers · 3 · $70M

The largest planned projects in Nebraska

The ten largest water, sewer and wastewater line items in Nebraska plans by planning budget.
#ProjectCityTypeBudgetYears
1Water Resource Recovery Facility ImprovementsOmaha, NEWastewater treatment plant upgrades$754M2025–2030
2Combined Sewer Overflow Control ImplementationOmaha, NESewer rehabilitation and I&I$555M2025–2030
3Interceptor Sewer Reconstruction and RehabilitationOmaha, NEForce mains and interceptors$182M2025–2030
4Infrastructure - Water Mains and MetersLincoln, NEWater mains and distribution$165M2025–2030
5Facilities UpgradeOmaha, NEPump stations$156M2033
6Sewer Reconstruction/RehabilitationOmaha, NESewer rehabilitation and I&I$140M2025–2030
7Combined Sewer Renovation ProgramOmaha, NESewer rehabilitation and I&I$128M2025–2030
8W-16-Water Main ReplacementBellevue, NEWater mains and distribution$106M2025–2030
9New Water Treatment & High Service PumpingLincoln, NEWater treatment plants$92M2025–2030
10Capital Asset Replacement ProgramOmaha, NEHeadworks, screening and grit$92M2025–2030

All 193 Nebraska line items in Klarifi

Every project with its description, page reference and source document, filterable by city, department, type, budget and year, linked to the plants and decision-makers in each city.

Start a free trial

Nebraska capital plan questions

Sources and methodology

Budgets and years are as published in each city’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Data refreshed September 11, 2026.