23 line items · $13M · starting 2026–2030 · 1 plan
Franklin's published capital plans list 23 water, sewer and wastewater line items with a combined planning budget of $13M, of which 6 items worth $2M sit in the wastewater and sewer departments. The largest single item is Cross St water tank replacement at $3M (2029–2040). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Cross St water tank replacement | Water Supply | Storage tanks and reservoirs | $3M | 2029–2040 |
| 2 | East Pleasant St Steel Water Tank | Water Supply | Storage tanks and reservoirs | $2M | 2028–2040 |
| 3 | Inflow & Infiltration Maint Program | Sewer | Membranes and filtration | $2M | 2025–2040 |
| 4 | Lead Service Line Replacement | Water Distribution | Lead service line replacement | $1M | 2025–2029 |
| 5 | Water Treatment Plant | Water Supply | Water treatment plants | $800K | 2025–2040 |
| 6 | Lake Ave Water Main Replacement | Water Distribution | Water mains and distribution | $500K | 2029 |
| 7 | Acme 1 Well Rehabilitation | Water Supply | Wells and groundwater | $440K | 2028 |
| 8 | Franklin Falls bldg & well | Water Supply | Wells and groundwater | $440K | 2030–2040 |
| 9 | Water Meter Replacement Program | Water Distribution | Meters and AMI | $420K | 2025–2040 |
| 10 | Well cleaning | Water Supply | Wells and groundwater | $375K | 2028–2040 |
13 more line items in Franklin, with descriptions and contacts
Klarifi holds every Franklin line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$4M
7 items
2026
$724K
4 items
2027
$105K
2 items
2028
$3M
4 items
2029
$4M
2 items
2030
$650K
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 6 | $2M | 19% |
| Water Supply | 10 | $8M | 60% |
| Water Distribution | 7 | $3M | 21% |
1 publicly owned treatment plant in Franklin with 22 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Wrbp Franklin Wastewater Treatment Plant | 3.53 | NH0100960 | 22 |
Sources and methodology
Budgets and years are as published in Franklin’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2040 (23 line items).
Data refreshed September 11, 2026.