3 line items · $54M · starting 2026 · 1 plan
Hoboken's published capital plans list 3 water, sewer and wastewater line items with a combined planning budget of $54M, of which 1 items worth $21M sit in the wastewater and sewer departments. The largest single item is Transmission & Distribution Mains; 2025-2027 Water Main Replacements at $23M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Transmission & Distribution Mains; 2025-2027 Water Main Replacements | Water Distribution | Water mains and distribution | $23M | 2026–2030 |
| 2 | North End High-Level Sewer System Roadway Reconstruction | Sewer | Sewer rehabilitation and I&I | $21M | 2025–2030 |
| 3 | Lead Service Line Replacement; 2025-2027 Lead Service Replacements | Water Distribution | Lead service line replacement | $10M | 2026–2030 |
Descriptions, page references and contacts for Hoboken
Klarifi holds every Hoboken line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$21M
1 items
2026
$33M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 1 | $21M | 39% |
| Water Distribution | 2 | $33M | 61% |
1 publicly owned treatment plant in Hoboken. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| North Hudson Sewerage Auth WWTP | 11.5 | NJ0026085 | 0 |
Sources and methodology
Budgets and years are as published in Hoboken’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2024–2025 (3 line items).
Data refreshed September 11, 2026.