9 line items · $12M · starting 2026–2030 · 1 plan
Bowling Green's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $12M, of which 7 items worth $5M sit in the wastewater and sewer departments. The largest single item is Well Replacements/Modification & Radionuclide Treatment at $7M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Well Replacements/Modification & Radionuclide Treatment | Water | Wells and groundwater | $7M | 2026 |
| 2 | Wastewater Treatment Equalization (EQ) Basin | Wastewater | Wastewater treatment plant upgrades | $3M | 2030 |
| 3 | Main Street Sewer Repair | Sewer | Sewer rehabilitation and I&I | $2M | 2025 |
| 4 | Wastewater Treatment Plant Upgrade-Phase I | Wastewater | Wastewater treatment plant upgrades | $500K | 2027 |
| 5 | Courthouse Lane Repair | Sewer | Sewer rehabilitation and I&I | $175K | 2025 |
| 6 | Truck- F150 | Water Distribution | Vehicles and equipment | $90K | 2027–2028 |
| 7 | Generator- Lift Station - Lacy Lane | Sewer | Lift stations | $60K | 2028 |
| 8 | Generator-Lift Station - Meadows | Sewer | Lift stations | $60K | 2026 |
| 9 | Generator- Lift Station - Oak Ridge | Sewer | Lift stations | $55K | 2027 |
Descriptions, page references and contacts for Bowling Green
Klarifi holds every Bowling Green line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$2M
2 items
2026
$7M
2 items
2027
$645K
3 items
2028
$60K
1 items
2030
$3M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 2 | $3M | 25% |
| Sewer | 5 | $2M | 15% |
| Water Distribution | 1 | $90K | 1% |
| Water | 1 | $7M | 59% |
1 publicly owned treatment plant in Bowling Green with 6 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Bowling Green Wastewater Treatment Plant | 0.09 | VA0020737 | 6 |
Sources and methodology
Budgets and years are as published in Bowling Green’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (9 line items).
Data refreshed September 11, 2026.