69 line items · $45M · starting 2026–2030 · 1 plan
Casper's published capital plans list 69 water, sewer and wastewater line items with a combined planning budget of $45M, of which 44 items worth $19M sit in the wastewater and sewer departments. The largest single item is FY30 Water Main Replacements at $5M (2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | FY30 Water Main Replacements | Water Distribution | Water mains and distribution | $5M | 2030 |
| 2 | FY29 Misc Water Main Replacement | Water Distribution | Water mains and distribution | $4M | 2029 |
| 3 | FY27 Misc Water Main Replacements | Water Distribution | Water mains and distribution | $4M | 2027 |
| 4 | FY28 Misc Water Main Replacement | Water Distribution | Water mains and distribution | $4M | 2028 |
| 5 | McKinley to Wolcott, 15th to Collin | Wastewater | — | $2M | 2028–2029 |
| 6 | Replace RAS pumps | Wastewater | Pump stations | $2M | 2030 |
| 7 | Replace Sec Clar #1 Feed line | Wastewater | — | $2M | 2027 |
| 8 | UV System Replacement | Wastewater | Disinfection and UV | $2M | 2026 |
| 9 | FY26 Water Main Replacement | Water Distribution | Water mains and distribution | $2M | 2026 |
| 10 | FY29 Equipment Replacements | Wastewater | Vehicles and equipment | $1M | 2029 |
59 more line items in Casper, with descriptions and contacts
Klarifi holds every Casper line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$7M
21 items
2027
$11M
17 items
2028
$11M
16 items
2029
$9M
13 items
2030
$7M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 38 | $18M | 41% |
| Sewer | 6 | $640K | 1% |
| Water Supply | 4 | $2M | 4% |
| Water Distribution | 21 | $24M | 54% |
2 publicly owned treatment plants in Casper with 54 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Sam H. Hobbs Regional WW Facility (prev. Casper Wwtf) | 6.67 | WY0021920 | 13 |
| Riverside Waste Water Treatment Facility | — | WY0032662 | 41 |
Sources and methodology
Budgets and years are as published in Casper’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (69 line items).
Data refreshed September 11, 2026.