13 line items · $13M · starting 2026–2030 · 1 plan
Powell's published capital plans list 13 water, sewer and wastewater line items with a combined planning budget of $13M, of which 6 items worth $1M sit in the wastewater and sewer departments. The largest single item is Division Street Reconstruction at $10M (2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Division Street Reconstruction | Water Distribution | Water mains and distribution | $10M | 2030 |
| 2 | Sewer Slip Lining | Sewer | Sewer rehabilitation and I&I | $600K | 2026–2027 |
| 3 | Water Main South Gilbert (South Street to Jefferson) | Water Distribution | Water mains and distribution | $553K | 2026 |
| 4 | Sewer Main (15in) South of Monroe Street | Sewer | Sewer rehabilitation and I&I | $500K | 2026 |
| 5 | Water Main South Division (North Street to W. Monroe Street) | Water Distribution | Water mains and distribution | $412K | 2026 |
| 6 | Dump Truck | Water Distribution | Vehicles and equipment | $150K | 2026 |
| 7 | Water Meters | Water Distribution | Meters and AMI | $115K | 2029 |
| 8 | Sewer Camera | Sewer | Sewer rehabilitation and I&I | $99K | 2026 |
| 9 | One Ton Truck | Wastewater | Vehicles and equipment | $97K | 2027 |
| 10 | Sewer Jet Install | Sewer | Sewer rehabilitation and I&I | $93K | 2028 |
3 more line items in Powell, with descriptions and contacts
Klarifi holds every Powell line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$2M
8 items
2027
$97K
1 items
2028
$167K
2 items
2029
$115K
1 items
2030
$10M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 2 | $177K | 1% |
| Sewer | 4 | $1M | 10% |
| Water Distribution | 7 | $11M | 89% |
1 publicly owned treatment plant in Powell with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Powell, City Of | 2.09 | WY0020648 | 7 |
Sources and methodology
Budgets and years are as published in Powell’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (13 line items).
Data refreshed September 11, 2026.