Beacon Falls, CT · New Haven County · Publicly Owned Treatment Works
Beacon Falls Water Pollution Control Fac is a publicly owned wastewater treatment works in Beacon Falls, New Haven County, Connecticut treating an average of 0.28 million gallons per day against a permitted design capacity of 0.71 MGD, serving about 6,033 residents. It discharges under NPDES permit CT0101061 (effective), which expires in April 2031, with 5 recorded violations in the last three years.
Treatment structures identified at this facility. Exact unit counts are available in Klarifi.
Treatment structure data not yet analyzed for this facility.
Based on NPDES Discharge Monitoring Reports. Full violation history, parameters and discharge data available in the Klarifi platform.
Beacon Falls's capital improvement plan lists 3 water, sewer and wastewater line items worth $1M starting 2026–2026. The largest budgeted items are shown here.
All water and sewer capital projects in Beacon Falls →
| Project | Budget | Years |
|---|---|---|
| Sludge Thickening System | $1,000,000 | 2026–2027 |
| WWTP Boiler/Furnace Replacement | $75,000 | 2026–2026 |
| Hydrant Replacement @ WWTP | $12,000 | 2026–2026 |
Full project details — scope, funding source, engineering consultant and the decision-makers behind each project — are available in Klarifi, along with similar wastewater capital projects in other cities.
2 verified contacts for Beacon Falls Water Pollution Control Fac, with validated emails and direct phone numbers.
Unlock 2 verified contacts
Names, validated emails and direct phone numbers for decision-makers at Beacon Falls Water Pollution Control Fac, plus the full compliance history and discharge data.
Seymour · 5 mi away
0.89 MGD
Ansonia · 7 mi away
1.3 MGD
Shelton · 8 mi away
1.6 MGD
Newtown · 11 mi away
0.3 MGD
Cheshire · 12 mi away
1.85 MGD
Southington (plantsville) · 14 mi away
3.67 MGD
Meriden · 14 mi away
6.49 MGD
Milford · 15 mi away
4.5 MGD
Sources and methodology
Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.
Data refreshed September 11, 2026; facility record last updated February 27, 2025.