Beacon Falls, Connecticut: water and wastewater capital improvement projects

3 line items · $1M · starting 2026 · 1 plan

Beacon Falls's published capital plans list 3 water, sewer and wastewater line items with a combined planning budget of $1M, of which 3 items worth $1M sit in the wastewater and sewer departments. The largest single item is Sludge Thickening System at $1M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Beacon Falls

The 3 largest water, sewer and wastewater line items in Beacon Falls’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Sludge Thickening SystemWastewaterBiosolids, sludge and dewatering$1M2026–2027
2WWTP Boiler/Furnace ReplacementWastewaterWastewater treatment plant upgrades$75K2026
3Hydrant Replacement @ WWTPWastewaterWastewater treatment plant upgrades$12K2026

Descriptions, page references and contacts for Beacon Falls

Klarifi holds every Beacon Falls line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$1M

3 items

By department

Line items and planning budgets by department, Beacon Falls.
DepartmentLine itemsBudgetShare
Wastewater3$1M100%

Wastewater treatment plants in Beacon Falls

1 publicly owned treatment plant in Beacon Falls with 5 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Beacon Falls Water Pollution Control Fac0.28CT01010615

Other Connecticut cities with capital plans

Beacon Falls capital plan questions

Sources and methodology

Budgets and years are as published in Beacon Falls’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (3 line items).

Data refreshed September 11, 2026.