9 line items · $18M · starting 2026–2029 · 1 plan
Glastonbury's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $18M, of which 9 items worth $18M sit in the wastewater and sewer departments. The largest single item is Parker Terrace Station and Force Main Replacement at $5M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Parker Terrace Station and Force Main Replacement | Sewer | Force mains and interceptors | $5M | 2024–2025 |
| 2 | Matson Hill Station and Force Main Replacement | Sewer | Force mains and interceptors | $3M | 2027–2030 |
| 3 | Hubbard Pump Station and Force Main Replacement | Sewer | Pump stations | $3M | 2029–2030 |
| 4 | Smith Pump Station and Force Main Replacement | Sewer | Pump stations | $3M | 2029–2030 |
| 5 | High Street Station and Force Main Replacement | Sewer | Force mains and interceptors | $2M | 2026–2030 |
| 6 | Nutmeg Pump Station and Force Main Replacement | Sewer | Pump stations | $1M | 2029–2030 |
| 7 | Sanitary Sewer and Force Maiin Integrity Study and Rehabiliation | Sewer | Headworks, screening and grit | $725K | 2026–2030 |
| 8 | Sanitary Sewer Master Plan Update | Sewer | Sewer rehabilitation and I&I | $250K | 2028–2029 |
| 9 | Water Pollution Control Roofs | Wastewater | Wastewater treatment plant upgrades | $100K | 2028–2029 |
Descriptions, page references and contacts for Glastonbury
Klarifi holds every Glastonbury line item with its description, the page it appears on and the source document, plus 18 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$5M
1 items
2026
$3M
2 items
2027
$3M
1 items
2028
$350K
2 items
2029
$6M
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 1 | $100K | 1% |
| Sewer | 8 | $17M | 99% |
1 publicly owned treatment plant in Glastonbury with 9 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Glastonbury Water Pollution Control Facility | 2.17 | CT0100226 | 9 |
Sources and methodology
Budgets and years are as published in Glastonbury’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (9 line items).