Glastonbury, Connecticut: water and wastewater capital improvement projects

9 line items · $18M · starting 2026–2029 · 1 plan

Glastonbury's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $18M, of which 9 items worth $18M sit in the wastewater and sewer departments. The largest single item is Parker Terrace Station and Force Main Replacement at $5M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Glastonbury

The 9 largest water, sewer and wastewater line items in Glastonbury’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Parker Terrace Station and Force Main ReplacementSewerForce mains and interceptors$5M2024–2025
2Matson Hill Station and Force Main ReplacementSewerForce mains and interceptors$3M2027–2030
3Hubbard Pump Station and Force Main ReplacementSewerPump stations$3M2029–2030
4Smith Pump Station and Force Main ReplacementSewerPump stations$3M2029–2030
5High Street Station and Force Main ReplacementSewerForce mains and interceptors$2M2026–2030
6Nutmeg Pump Station and Force Main ReplacementSewerPump stations$1M2029–2030
7Sanitary Sewer and Force Maiin Integrity Study and RehabiliationSewerHeadworks, screening and grit$725K2026–2030
8Sanitary Sewer Master Plan UpdateSewerSewer rehabilitation and I&I$250K2028–2029
9Water Pollution Control RoofsWastewaterWastewater treatment plant upgrades$100K2028–2029

Descriptions, page references and contacts for Glastonbury

Klarifi holds every Glastonbury line item with its description, the page it appears on and the source document, plus 18 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$5M

1 items

2026

$3M

2 items

2027

$3M

1 items

2028

$350K

2 items

2029

$6M

3 items

By department

Line items and planning budgets by department, Glastonbury.
DepartmentLine itemsBudgetShare
Wastewater1$100K1%
Sewer8$17M99%

Wastewater treatment plants in Glastonbury

1 publicly owned treatment plant in Glastonbury with 9 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Glastonbury Water Pollution Control Facility2.17CT01002269

Other Connecticut cities with capital plans

Glastonbury capital plan questions

Sources and methodology

Budgets and years are as published in Glastonbury’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (9 line items).

Data refreshed September 11, 2026.