Westport, Connecticut: water and wastewater capital improvement projects

12 line items · $2M · starting 2026–2031 · 1 plan

Westport's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $2M, of which 12 items worth $2M sit in the wastewater and sewer departments. The largest single item is Upgrade Mechanical Aerators at $550K (2028–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Westport

The 10 largest water, sewer and wastewater line items in Westport’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Upgrade Mechanical AeratorsWastewaterAeration and blowers$550K2028–2029
2500KW Generator #2 at PlantWastewaterGenerators, power and electrical$400K2026
3500KW Generator #1 at PlantWastewaterGenerators, power and electrical$350K2025
4Rebuild Grit ConcentratorWastewaterHeadworks, screening and grit$250K2027
5Pave All Pavement Areas at PlantWastewater$200K2031
6Rebuild Sludge ThickenerWastewaterBiosolids, sludge and dewatering$150K2025
7Upgrade/Replace Honeywell BACnet BuildingWastewaterBuildings, HVAC and site work$125K2030
8Roofs, Doors and Bilco's for PS#'s 1, 4, 7, and 12SewerPump stations$120K2029
9New Pumps for PS#1SewerPump stations$100K2029
10Roofs, Doors and Bilco's for PS#'s 9, 10, 11, 14, and 15SewerPump stations$100K2027

2 more line items in Westport, with descriptions and contacts

Klarifi holds every Westport line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$500K

2 items

2026

$400K

1 items

2027

$350K

2 items

2028

$550K

1 items

2029

$285K

3 items

2030

$125K

1 items

2031

$275K

2 items

By department

Line items and planning budgets by department, Westport.
DepartmentLine itemsBudgetShare
Wastewater7$2M81%
Sewer5$460K19%

Wastewater treatment plants in Westport

1 publicly owned treatment plant in Westport. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Westport WPCF1.46CT01006840

Other Connecticut cities with capital plans

Westport capital plan questions

Sources and methodology

Budgets and years are as published in Westport’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2035 (12 line items).

Data refreshed September 11, 2026.