12 line items · $2M · starting 2026–2031 · 1 plan
Westport's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $2M, of which 12 items worth $2M sit in the wastewater and sewer departments. The largest single item is Upgrade Mechanical Aerators at $550K (2028–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Upgrade Mechanical Aerators | Wastewater | Aeration and blowers | $550K | 2028–2029 |
| 2 | 500KW Generator #2 at Plant | Wastewater | Generators, power and electrical | $400K | 2026 |
| 3 | 500KW Generator #1 at Plant | Wastewater | Generators, power and electrical | $350K | 2025 |
| 4 | Rebuild Grit Concentrator | Wastewater | Headworks, screening and grit | $250K | 2027 |
| 5 | Pave All Pavement Areas at Plant | Wastewater | — | $200K | 2031 |
| 6 | Rebuild Sludge Thickener | Wastewater | Biosolids, sludge and dewatering | $150K | 2025 |
| 7 | Upgrade/Replace Honeywell BACnet Building | Wastewater | Buildings, HVAC and site work | $125K | 2030 |
| 8 | Roofs, Doors and Bilco's for PS#'s 1, 4, 7, and 12 | Sewer | Pump stations | $120K | 2029 |
| 9 | New Pumps for PS#1 | Sewer | Pump stations | $100K | 2029 |
| 10 | Roofs, Doors and Bilco's for PS#'s 9, 10, 11, 14, and 15 | Sewer | Pump stations | $100K | 2027 |
2 more line items in Westport, with descriptions and contacts
Klarifi holds every Westport line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$500K
2 items
2026
$400K
1 items
2027
$350K
2 items
2028
$550K
1 items
2029
$285K
3 items
2030
$125K
1 items
2031
$275K
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 7 | $2M | 81% |
| Sewer | 5 | $460K | 19% |
1 publicly owned treatment plant in Westport. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Westport WPCF | 1.46 | CT0100684 | 0 |
Sources and methodology
Budgets and years are as published in Westport’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2035 (12 line items).
Data refreshed September 11, 2026.