Danbury, Connecticut: water and wastewater capital improvement projects

51 line items · $102M · 1 plan

Danbury's published capital plans list 51 water, sewer and wastewater line items with a combined planning budget of $102M, of which 30 items worth $66M sit in the wastewater and sewer departments. The largest single item is West Side Sewer Line Program - Phase II at $20M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Danbury

The 10 largest water, sewer and wastewater line items in Danbury’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1West Side Sewer Line Program - Phase IISewerSewer rehabilitation and I&I$20M2025–2028
2EcoFactorySewer$11M2025–2027
3Margerie High Service Tank and InterconnectionWater SupplyStorage tanks and reservoirs$8M2025–2028
4Water Supply Safe Yield Improvement ProjectsWater Supply$8M2025–2028
5Sewer Interceptor Capacity UpgradesSewerForce mains and interceptors$7M2025–2028
6Beaver Brook Pump Station Improvement ProgramSewerPump stations$6M2025–2028
7Water Main Replacement / Upgrades - Alan AveWater DistributionWater mains and distribution$3M2025–2028
8Mill Plain Sewer Extension and Pump Station eliminationSewerPump stations$3M2025–2027
9Middle River Road Retaining Wall Repair / ReplacementWater SupplyBuildings, HVAC and site work$3M2025–2028
10Margerie WTP - Replace 30 inch steel distribution line.Water DistributionWater treatment plants$3M2025–2027

41 more line items in Danbury, with descriptions and contacts

Klarifi holds every Danbury line item with its description, the page it appears on and the source document, plus 10 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$102M

51 items

By department

Line items and planning budgets by department, Danbury.
DepartmentLine itemsBudgetShare
Sewer30$66M65%
Water Supply15$24M23%
Water Distribution6$12M12%

Project types in Danbury's plan

Wastewater treatment plants in Danbury

1 publicly owned treatment plant in Danbury with 5 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Danbury Water Pollution Control Facility7.8CT01001455

Other Connecticut cities with capital plans

Danbury capital plan questions

Sources and methodology

Budgets and years are as published in Danbury’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2031 (51 line items).

Data refreshed September 11, 2026.