Stratford Water Pollution Control Facility

105 Beacon Point Road, Stratford, CT 06615 · Fairfield County · Publicly Owned Treatment Works

Average flow
7.32 MGD
Design flow
11.5 MGD
NPDES permit
CT0101036
Expired
Permit expires
September 2025
Population served
48,887
CWNS 2022

Stratford Water Pollution Control Facility is a publicly owned wastewater treatment works in Stratford, Fairfield County, Connecticut treating an average of 7.32 million gallons per day against a permitted design capacity of 11.5 MGD, serving about 48,887 residents. It discharges under NPDES permit CT0101036 (expired), which expires in September 2025, with 37 recorded violations in the last three years. EPA has recorded 1 formal enforcement action naming the plant, the latest in June 2023.

Treatment technology

One treatment structure or unit process identified at Stratford Water Pollution Control Facility.

Available with a free Klarifi account

See the full treatment train at Stratford Water Pollution Control Facility: structures, unit processes and planned upgrades, with exact unit counts.

Create a free account

Compliance snapshot (last 3 years)

Total violations
37
Effluent violations
26

Based on NPDES Discharge Monitoring Reports. Full violation history, parameters and discharge data available in the Klarifi platform.

EPA enforcement history

Federal civil enforcement cases, compliance inspections and informal actions recorded for Stratford Water Pollution Control Facility in EPA's ICIS system.

Formal actions
1
0 since FY2020
Compliance actions
$80,000
required by EPA orders
EPA inspections
1
latest Sep 2008

Latest case · Jun 2023

STRATFORD WPCF

Administrative order · CWA, NPDES Permit Violations · Final Order No Penalty · Compliance actions $80,000

EPA's description of the case:

“On 6/24/10, EPA issued a CWA administrative order to the Town of Stratford, CT for its failure to report bypasses of its collection system to the CT DEP as required by its NPDES Permit.”

Source: EPA ECHO, civil enforcement case 01-2010-2006.

Full case history with a free Klarifi account

Every action against Stratford Water Pollution Control Facility with dates, milestones, violation types and EPA's complete case summaries, plus inspections and informal actions.

Create a free account

Capital improvement projects in Stratford

Stratford's capital improvement plan lists 12 water, sewer and wastewater line items worth $23M starting 2027–2030. The largest budgeted items are shown here.

All water and sewer capital projects in Stratford →

ProjectBudgetYears
Sanitary Pump Station Renovations$4,950,0002027–2028
Oak Bluff Force main$4,250,0002027–2029
Broadbridge Ave sewer capacity upgrade$2,925,0002027–2030
Broadbridge Avenue Force main$2,250,0002030–2030
WPCA Inflow and Infiltration Investigation and Remediation Plan/Replace/Upgrade/Repair Projects$2,000,0002027–2030

Full project details — scope, funding source, engineering consultant and the decision-makers behind each project — are available in Klarifi, along with similar wastewater capital projects in other cities.

See full project details

Find similar projects in other cities →

Key contacts

8 verified contacts for Stratford Water Pollution Control Facility, with validated emails and direct phone numbers.

Unlock 8 verified contacts (5 more than shown)

Names, validated emails and direct phone numbers for decision-makers at Stratford Water Pollution Control Facility, plus the full compliance history and discharge data.

Try Klarifi free

Nearby wastewater treatment plants in Connecticut

5.24 MGD

Milford - Housatonic WPCF

Milford · 3 mi away

5.85 MGD

17.54 MGD

7.87 MGD

2.12 MGD

1.71 MGD

Westport WPCF

Westport · 13 mi away

1.84 MGD

Seymour WPCF

Seymour · 13 mi away

1.12 MGD

Stratford Water Pollution Control Facility: frequently asked questions

Sources and methodology

Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.

Data refreshed October 26, 2026; facility record last updated March 24, 2025.