9 line items · $17M · starting 2026–2027 · 1 plan
Muscatine's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $17M, of which 9 items worth $17M sit in the wastewater and sewer departments. The largest single item is West Hill Sewer Separation Project at $6M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | West Hill Sewer Separation Project | Sewer | Sewer rehabilitation and I&I | $6M | 2025–2026 |
| 2 | Nutrient and Struvite Mitigation Algae Project | Wastewater | Nutrient removal | $3M | 2025 |
| 3 | Dual Use Redundant Force Main (DURF) | Sewer | Force mains and interceptors | $3M | 2025 |
| 4 | Progress Park Force Main Redundant Line | Sewer | Force mains and interceptors | $2M | 2025–2027 |
| 5 | UV System Replacement | Wastewater | Disinfection and UV | $1M | 2025 |
| 6 | Papoose Station Generator & Restroom | Wastewater | Generators, power and electrical | $850K | 2025 |
| 7 | Lift Station Façade Renovation | Sewer | Lift stations | $760K | 2027 |
| 8 | Effluent Discharge Vault Overhaul and Redundant Line | Wastewater | — | $650K | 2026 |
| 9 | 2nd Avenue Stormwater Infiltration Project | Sewer | Membranes and filtration | $75K | 2026 |
Descriptions, page references and contacts for Muscatine
Klarifi holds every Muscatine line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$15M
6 items
2026
$725K
2 items
2027
$760K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 4 | $6M | 33% |
| Sewer | 5 | $11M | 67% |
1 publicly owned treatment plant in Muscatine with 20 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| City Of Muscatine Water & Resource Recovery Facility | — | IA0023434 | 20 |
Sources and methodology
Budgets and years are as published in Muscatine’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2028 (9 line items).
Data refreshed September 11, 2026.