Muscatine, Iowa: water and wastewater capital improvement projects

9 line items · $17M · starting 2026–2027 · 1 plan

Muscatine's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $17M, of which 9 items worth $17M sit in the wastewater and sewer departments. The largest single item is West Hill Sewer Separation Project at $6M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Muscatine

The 9 largest water, sewer and wastewater line items in Muscatine’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1West Hill Sewer Separation ProjectSewerSewer rehabilitation and I&I$6M2025–2026
2Nutrient and Struvite Mitigation Algae ProjectWastewaterNutrient removal$3M2025
3Dual Use Redundant Force Main (DURF)SewerForce mains and interceptors$3M2025
4Progress Park Force Main Redundant LineSewerForce mains and interceptors$2M2025–2027
5UV System ReplacementWastewaterDisinfection and UV$1M2025
6Papoose Station Generator & RestroomWastewaterGenerators, power and electrical$850K2025
7Lift Station Façade RenovationSewerLift stations$760K2027
8Effluent Discharge Vault Overhaul and Redundant LineWastewater$650K2026
92nd Avenue Stormwater Infiltration ProjectSewerMembranes and filtration$75K2026

Descriptions, page references and contacts for Muscatine

Klarifi holds every Muscatine line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$15M

6 items

2026

$725K

2 items

2027

$760K

1 items

By department

Line items and planning budgets by department, Muscatine.
DepartmentLine itemsBudgetShare
Wastewater4$6M33%
Sewer5$11M67%

Wastewater treatment plants in Muscatine

1 publicly owned treatment plant in Muscatine with 20 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
City Of Muscatine Water & Resource Recovery FacilityIA002343420

Other Iowa cities with capital plans

Muscatine capital plan questions

Sources and methodology

Budgets and years are as published in Muscatine’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2028 (9 line items).

Data refreshed September 11, 2026.