12 line items · $19M · starting 2026–2030 · 1 plan
Nevada's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $19M, of which 4 items worth $2M sit in the wastewater and sewer departments. The largest single item is Water Plant Expansion at $13M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Plant Expansion | Water Supply | Wastewater treatment plant upgrades | $13M | 2026–2027 |
| 2 | 2”/4” Water Main Replacement - 9th St. (E-I Ave., J Ave.-L Ave.) 7th St. (E Ave.-H Ave., 10th St. from J Ave.- L Ave), Alley(7th St.-8th St. from L Ave.-N Ave., | Water Distribution | Water mains and distribution | $1M | 2030 |
| 3 | Public Infrastructure for Nevada Dev LLC | Sewer | — | $1M | 2025–2027 |
| 4 | Water Plant Improvements (2027) (xtr to WUPRS) | Water Supply | Wastewater treatment plant upgrades | $600K | 2025–2030 |
| 5 | LHW Reconstruction, #3 | Water Distribution | Water mains and distribution | $536K | 2030 |
| 6 | 2”/4” Water Main Replacement - 16th, 17th & 18th St., H Ave. to F Ave. 15th-F Ave | Water Distribution | Water mains and distribution | $500K | 2026–2027 |
| 7 | SE lining CIPP/manhole rehab-17-18 blcks | Sewer | Sewer rehabilitation and I&I | $440K | 2027–2028 |
| 8 | LHW Reconstruction, #2 | Water Distribution | Water mains and distribution | $420K | 2030 |
| 9 | LHW Reconstr, - 11th to 14th (2027) | Sewer | — | $350K | 2030 |
| 10 | LHW Reconstr, - 1st St. to 3rd st | Sewer | — | $227K | 2026–2028 |
2 more line items in Nevada, with descriptions and contacts
Klarifi holds every Nevada line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$2M
2 items
2026
$14M
4 items
2027
$440K
1 items
2030
$3M
5 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 4 | $2M | 11% |
| Water Supply | 2 | $14M | 73% |
| Water Distribution | 6 | $3M | 16% |
1 publicly owned treatment plant in Nevada with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Nevada City Of WWTP | — | IA0053648 | 2 |
Sources and methodology
Budgets and years are as published in Nevada’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2023–2029 (12 line items).
Data refreshed September 11, 2026.