29 line items · $10M · starting 2026–2029 · 1 plan
North Liberty's published capital plans list 29 water, sewer and wastewater line items with a combined planning budget of $10M, of which 17 items worth $5M sit in the wastewater and sewer departments. The largest single item is Gravity Sanitary Sewer at $2M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Gravity Sanitary Sewer | Sewer | Sewer rehabilitation and I&I | $2M | 2026–2027 |
| 2 | Water Tower #3 | Water Supply | Storage tanks and reservoirs | $2M | 2026–2027 |
| 3 | Water Treatment Facility Addition | Water Supply | Wastewater treatment plant upgrades | $1M | 2026–2027 |
| 4 | Membrane Train Cassettes | Wastewater | Membranes and filtration | $1M | 2025–2030 |
| 5 | Cedar Springs Lift Station | Sewer | Lift stations | $450K | 2026–2027 |
| 6 | Membrane Train Modules | Water Supply | Membranes and filtration | $420K | 2025–2030 |
| 7 | Membrane Full Replacement | Wastewater | Membranes and filtration | $300K | 2025–2026 |
| 8 | Dump Truck | Water Supply | Vehicles and equipment | $210K | 2026–2027 |
| 9 | Service Trucks (2) | Water Distribution | Vehicles and equipment | $190K | 2029–2030 |
| 10 | Jordan Well Cleaning | Water Supply | Wells and groundwater | $175K | 2025–2026 |
19 more line items in North Liberty, with descriptions and contacts
Klarifi holds every North Liberty line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$2M
10 items
2026
$6M
6 items
2027
$413K
7 items
2028
$246K
3 items
2029
$390K
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 10 | $2M | 19% |
| Sewer | 7 | $3M | 34% |
| Water Supply | 7 | $4M | 40% |
| Water Distribution | 5 | $695K | 7% |
1 publicly owned treatment plant in North Liberty. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| North Liberty WWTP | — | IA0032905 | 0 |
Sources and methodology
Budgets and years are as published in North Liberty’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (29 line items).
Data refreshed September 11, 2026.