Water, sewer and wastewater line items in Ottawa’s published capital improvement plans and adopted budgets, with budgets, years and the source documents.
- Planned budget
- $920K
- Line items
- 7
- Wastewater and sewer
- $350K
- Starting
- 2026–2029
- Plan
- 1
Ottawa's published capital plans list 7 water, sewer and wastewater line items with a combined planning budget of $920K, of which 2 items worth $350K sit in the wastewater and sewer departments. The largest single item is PLC and SCADA Upgrades at $250K (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
The largest water and sewer projects in Ottawa
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | PLC and SCADA Upgrades | Wastewater | SCADA, controls and instrumentation | $250K | 2025 |
| 2 | Replace Water Line - Davis Road | Water Distribution | Water mains and distribution | $150K | 2029 |
| 3 | Replace Water Line - 19th and Elm to Twyman | Water Distribution | Water mains and distribution | $145K | 2026 |
| 4 | Replace Pin Oak Pump Station | Sewer | Pump stations | $100K | 2025 |
| 5 | Replace Water Line 15th - 17th Main | Water Distribution | Water mains and distribution | $100K | 2025 |
| 6 | Replace Water Line - Cedar Street 1st - 4th St | Water Distribution | Water mains and distribution | $90K | 2027 |
| 7 | Replace Water Line - 4th - 7th St on Cedar | Water Distribution | Water mains and distribution | $85K | 2028 |
Planned spend by start year
By department
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 1 | $250K | 27% |
| Sewer | 1 | $100K | 11% |
| Water Distribution | 5 | $570K | 62% |
Project types in Ottawa's plan
- Water mains and distribution5 line items$570K
- SCADA, controls and instrumentation1 line items$250K
- Pump stations1 line items$100K
Wastewater treatment plants in Ottawa
1 publicly owned treatment plant in Ottawa with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Ottawa, City Of (new Plant) | 1.01 | KS0097535 | 2 |
Other Kansas cities with capital plans
- $1.1B
- $394M
- $262M
- $120M
- $50M
- $41M
- $10M
Ottawa capital plan questions
How much is Ottawa, KS planning to spend on water and sewer infrastructure?
Ottawa’s published capital plans list 7 water, sewer and wastewater line items with a combined budget of $920K, of which $350K is in the wastewater and sewer departments.
What is the largest capital project in Ottawa’s plan?
PLC and SCADA Upgrades, budgeted at $250K and scheduled for 2025 under the Wastewater department.
When do Ottawa’s water and sewer projects start?
1 projects ($145K) start in 2026 and 1 projects ($90K) start in 2027. Budgets are as published in the plan and can change at adoption.
How do I find the contacts and full project list for Ottawa?
Klarifi holds every line item with its description, page reference and source document. The public page shows the ten largest items; the full list is available with a free trial.