Wichita, Kansas: water and wastewater capital improvement projects

89 line items · $1.1B · starting 2026–2031 · 1 plan

Wichita's published capital plans list 89 water, sewer and wastewater line items with a combined planning budget of $1.1B, of which 31 items worth $244M sit in the wastewater and sewer departments. The largest single item is Neighborhood Improvements at $305M (2025–2034). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Wichita

The 10 largest water, sewer and wastewater line items in Wichita’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Neighborhood ImprovementsWater Supply$305M2025–2034
2TRANS Cheney Parallel/Redundant PipelineWater DistributionWater mains and distribution$93M2028–2031
3DIST Distribution Mains Repl.Water DistributionWater mains and distribution$70M2025–2034
4COLL Mains ReplacementSewerWater mains and distribution$66M2025–2034
5WTP Future ModificationsWater SupplyWater treatment plants$40M2025–2032
6DIST PCCP RehabilitationsWater Supply$36M2025–2033
7WWTP Plant 3 ExpansionSewerWastewater treatment plant upgrades$34M2029–2033
8DIST Mains for Future Dvlpmt.Water DistributionWater mains and distribution$31M2025–2034
9DIST Arterial Water MainsWater DistributionWater mains and distribution$30M2025–2034
10Hess Suction Yard Piping & Valves PH IIWater SupplyWater mains and distribution$30M2033

79 more line items in Wichita, with descriptions and contacts

Klarifi holds every Wichita line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$748M

31 items

2026

$33M

9 items

2027

$34M

8 items

2028

$104M

5 items

2029

$34M

3 items

2030

$13M

3 items

2031

$15M

7 items

2032 and later

$117M

23 items

By department

Line items and planning budgets by department, Wichita.
DepartmentLine itemsBudgetShare
Wastewater6$11M1%
Sewer25$233M21%
Water Supply49$611M56%
Water Distribution9$241M22%

Project types in Wichita's plan

Wastewater treatment plants in Wichita

2 publicly owned treatment plants in Wichita with 15 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Wichita - Four Mile Creek - New2.41KS010079010
Wichita #3 Wastewater Plant0.98KS00956815

Other Kansas cities with capital plans

Wichita capital plan questions

Sources and methodology

Budgets and years are as published in Wichita’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2034 (89 line items).

Data refreshed September 11, 2026.