27 line items · $394M · starting 2026–2030 · 1 plan
Topeka's published capital plans list 27 water, sewer and wastewater line items with a combined planning budget of $394M, of which 10 items worth $160M sit in the wastewater and sewer departments. The largest single item is 2026 - 2030 Water Main Replacement Program at $126M (2025–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | 2026 - 2030 Water Main Replacement Program | Water Distribution | Water mains and distribution | $126M | 2025–2031 |
| 2 | 2026 - 2030 Wastewater Lining & Replacement Program | Wastewater | Headworks, screening and grit | $67M | 2025–2031 |
| 3 | Sanitary Sewer Interceptor Maintenance & Rehabilitation Program | Wastewater | Force mains and interceptors | $28M | 2025–2031 |
| 4 | 2026-2030 Wastewater Pump Station Rehabilitation & Replacement | Wastewater | Pump stations | $25M | 2025–2031 |
| 5 | Disinfection Modification | Water Supply | Disinfection and UV | $25M | 2025–2030 |
| 6 | 2026 - 2030 Water Treatment Plant Rehabilitation Program | Water Supply | Wastewater treatment plant upgrades | $15M | 2025–2031 |
| 7 | 2026 - 2030 Odor Control Program | Wastewater | Odor and corrosion control | $14M | 2025–2031 |
| 8 | 2026 - 2030 WPC Facility Rehabilitation Program | Wastewater | Headworks, screening and grit | $13M | 2025–2031 |
| 9 | Central Zone Improvements & Optimizations Phase II | Water Supply | Water mains and distribution | $11M | 2025–2031 |
| 10 | Southeast Zone Improvements & Optimizations | Water Supply | Water mains and distribution | $10M | 2025–2031 |
17 more line items in Topeka, with descriptions and contacts
Klarifi holds every Topeka line item with its description, the page it appears on and the source document, plus 29 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$371M
22 items
2026
$15M
3 items
2029
$4M
1 items
2030
$4M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 10 | $160M | 41% |
| Water Supply | 14 | $100M | 25% |
| Water Distribution | 3 | $134M | 34% |
3 publicly owned treatment plants in Topeka with 70 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Topeka Oakland Wastewater Plant | 10.55 | KS0042722 | 63 |
| Sherwood Reg WWTP | 0.85 | KS0117731 | 4 |
| Shawnee Heights To Carbondale | — | KS0116556 | 3 |
Sources and methodology
Budgets and years are as published in Topeka’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2035 (27 line items).
Data refreshed September 11, 2026.