56 planned projects · $227M · 1 cities · 1 plans
The 1 capital improvement plans and adopted budgets Klarifi has extracted for Kentucky list 56 water, sewer and wastewater line items with a combined planning budget of $227M across 1 cities. Lexington has the largest plan at $227M. Each city page lists its largest projects with budgets and years, links the source document and the city's treatment plants.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | City | Line items | Budget | Plans |
|---|---|---|---|---|
| 1 | Lexington | 56 | $227M | 1 |
2026
$173M
37 items
2027
$27M
13 items
2028
$24M
4 items
2030
$3M
1 items
2031
$650K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 38 | $204M | 90% |
| Water Supply | 10 | $14M | 6% |
| Water Distribution | 8 | $9M | 4% |
| # | Project | City | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | North Elkhorn Pump Station Equalization Tank | Lexington, KY | Pump stations | $53M | 2026–2029 |
| 2 | Sanitary Sewer Rehabilitation Project | Lexington, KY | Sewer rehabilitation and I&I | $36M | 2026–2031 |
| 3 | Water Quality replacements | Lexington, KY | — | $14M | 2026–2031 |
| 4 | Town Branch Wet Weather Storage Tank Phase II | Lexington, KY | Storage tanks and reservoirs | $13M | 2028–2029 |
| 5 | Mint Lane Pump Station | Lexington, KY | Pump stations | $8M | 2026–2027 |
| 6 | Gravity Line Sewer Cleaning | Lexington, KY | Sewer rehabilitation and I&I | $8M | 2026–2031 |
| 7 | Treatment Plant Odor Control Management | Lexington, KY | Odor and corrosion control | $8M | 2027–2031 |
| 8 | Division of Water Quality Building Renovation | Lexington, KY | Buildings, HVAC and site work | $6M | 2026 |
| 9 | Georgetown Road Newtown Pike Upgrades Phases I and II | Lexington, KY | Sewer rehabilitation and I&I | $6M | 2028–2030 |
| 10 | Stormwater Rehabilitation Project | Lexington, KY | Stormwater and flood resilience | $6M | 2026–2031 |
All 56 Kentucky line items in Klarifi
Every project with its description, page reference and source document, filterable by city, department, type, budget and year, linked to the plants and decision-makers in each city.
Sources and methodology
Budgets and years are as published in each city’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Data refreshed September 11, 2026.