Lexington, Kentucky: water and wastewater capital improvement projects

56 line items · $227M · starting 2026–2031 · 1 plan

Lexington's published capital plans list 56 water, sewer and wastewater line items with a combined planning budget of $227M, of which 38 items worth $204M sit in the wastewater and sewer departments. The largest single item is North Elkhorn Pump Station Equalization Tank at $53M (2026–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Lexington

The 10 largest water, sewer and wastewater line items in Lexington’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1North Elkhorn Pump Station Equalization TankSewerPump stations$53M2026–2029
2Sanitary Sewer Rehabilitation ProjectSewerSewer rehabilitation and I&I$36M2026–2031
3Water Quality replacementsSewer$14M2026–2031
4Town Branch Wet Weather Storage Tank Phase IISewerStorage tanks and reservoirs$13M2028–2029
5Mint Lane Pump StationSewerPump stations$8M2026–2027
6Gravity Line Sewer CleaningSewerSewer rehabilitation and I&I$8M2026–2031
7Treatment Plant Odor Control ManagementSewerOdor and corrosion control$8M2027–2031
8Division of Water Quality Building RenovationWater SupplyBuildings, HVAC and site work$6M2026
9Georgetown Road Newtown Pike Upgrades Phases I and IISewerSewer rehabilitation and I&I$6M2028–2030
10Stormwater Rehabilitation ProjectSewerStormwater and flood resilience$6M2026–2031

46 more line items in Lexington, with descriptions and contacts

Klarifi holds every Lexington line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$173M

37 items

2027

$27M

13 items

2028

$24M

4 items

2030

$3M

1 items

2031

$650K

1 items

By department

Line items and planning budgets by department, Lexington.
DepartmentLine itemsBudgetShare
Sewer38$204M90%
Water Supply10$14M6%
Water Distribution8$9M4%

Project types in Lexington's plan

Wastewater treatment plants in Lexington

No publicly owned treatment plant is recorded under Lexington in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Kentucky.

Lexington capital plan questions

Sources and methodology

Budgets and years are as published in Lexington’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: Adopted Budget 2025–2026 (56 line items).

Data refreshed September 11, 2026.