11 line items · $14M · starting 2026 · 1 plan
Westminster's published capital plans list 11 water, sewer and wastewater line items with a combined planning budget of $14M, of which 5 items worth $11M sit in the wastewater and sewer departments. The largest single item is WWTP Plant Expansion at $9M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | WWTP Plant Expansion | Wastewater | Wastewater treatment plant upgrades | $9M | 2025 |
| 2 | Inflow and Infiltration (I&I) | Sewer | Membranes and filtration | $2M | 2025–2027 |
| 3 | Taste and Odor Treatment (GAC) | Water Distribution | Odor and corrosion control | $1M | 2025–2026 |
| 4 | New Water Supply Source Development | Water Distribution | — | $750K | 2025–2027 |
| 5 | Vehicle& Equipment Replacement | Sewer | Vehicles and equipment | $485K | 2025–2026 |
| 6 | Vehicle/Equipment Replacement | Water Distribution | Vehicles and equipment | $330K | 2025–2026 |
| 7 | GIS Engineering | Water Distribution | Planning, studies and asset management | $150K | 2025–2027 |
| 8 | GIS Layers | Sewer | Planning, studies and asset management | $150K | 2025–2027 |
| 9 | Valve Replacement | Water Distribution | Water mains and distribution | $100K | 2025–2026 |
| 10 | Pump Station Upgrades and Pumps | Water Distribution | Pump stations | $90K | 2025–2027 |
1 more line items in Westminster, with descriptions and contacts
Klarifi holds every Westminster line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$14M
10 items
2026
$75K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 2 | $9M | 62% |
| Sewer | 3 | $3M | 20% |
| Water Distribution | 6 | $2M | 17% |
2 publicly owned treatment plants in Westminster with 12 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Westminster WWTP | 3.41 | MD0021831 | 9 |
| Runnymede WWTP | 0.002 | MD0065927 | 3 |
Sources and methodology
Budgets and years are as published in Westminster’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2022–2027 (11 line items).
Data refreshed September 11, 2026.