Westminster, Maryland: water and wastewater capital improvement projects

11 line items · $14M · starting 2026 · 1 plan

Westminster's published capital plans list 11 water, sewer and wastewater line items with a combined planning budget of $14M, of which 5 items worth $11M sit in the wastewater and sewer departments. The largest single item is WWTP Plant Expansion at $9M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Westminster

The 10 largest water, sewer and wastewater line items in Westminster’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WWTP Plant ExpansionWastewaterWastewater treatment plant upgrades$9M2025
2Inflow and Infiltration (I&I)SewerMembranes and filtration$2M2025–2027
3Taste and Odor Treatment (GAC)Water DistributionOdor and corrosion control$1M2025–2026
4New Water Supply Source DevelopmentWater Distribution$750K2025–2027
5Vehicle& Equipment ReplacementSewerVehicles and equipment$485K2025–2026
6Vehicle/Equipment ReplacementWater DistributionVehicles and equipment$330K2025–2026
7GIS EngineeringWater DistributionPlanning, studies and asset management$150K2025–2027
8GIS LayersSewerPlanning, studies and asset management$150K2025–2027
9Valve ReplacementWater DistributionWater mains and distribution$100K2025–2026
10Pump Station Upgrades and PumpsWater DistributionPump stations$90K2025–2027

1 more line items in Westminster, with descriptions and contacts

Klarifi holds every Westminster line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$14M

10 items

2026

$75K

1 items

By department

Line items and planning budgets by department, Westminster.
DepartmentLine itemsBudgetShare
Wastewater2$9M62%
Sewer3$3M20%
Water Distribution6$2M17%

Wastewater treatment plants in Westminster

2 publicly owned treatment plants in Westminster with 12 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Westminster WWTP3.41MD00218319
Runnymede WWTP0.002MD00659273

Other Maryland cities with capital plans

Westminster capital plan questions

Sources and methodology

Budgets and years are as published in Westminster’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2022–2027 (11 line items).

Data refreshed September 11, 2026.

Try Klarifi for free