9 line items · $560K · 1 plan
Windom's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $560K, of which 4 items worth $320K sit in the wastewater and sewer departments. The largest single item is General Equipment at $160K (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | General Equipment | Wastewater | Vehicles and equipment | $160K | 2025–2030 |
| 2 | Filter Plant Improvements | Water Supply | Membranes and filtration | $80K | 2025–2030 |
| 3 | Interceptor\Collection System Improvements | Sewer | Force mains and interceptors | $80K | 2025–2030 |
| 4 | General Plant Improvement\Maintence | Wastewater | Wastewater treatment plant upgrades | $40K | 2025–2030 |
| 5 | Hydrants | Water Distribution | Water mains and distribution | $40K | 2025–2030 |
| 6 | Lift Station Improvements | Sewer | Lift stations | $40K | 2025–2030 |
| 7 | Pumping Equipment | Water Supply | Vehicles and equipment | $40K | 2025–2030 |
| 8 | Water Main Improvements | Water Distribution | Water mains and distribution | $40K | 2025–2030 |
| 9 | Wells and Well Site | Water Supply | Wells and groundwater | $40K | 2025–2030 |
Descriptions, page references and contacts for Windom
Klarifi holds every Windom line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$560K
9 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 2 | $200K | 36% |
| Sewer | 2 | $120K | 21% |
| Water Supply | 3 | $160K | 29% |
| Water Distribution | 2 | $80K | 14% |
1 publicly owned treatment plant in Windom with 4 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Delft Sanitary District WWTP | 0.0021 | MN0066541 | 4 |
Sources and methodology
Budgets and years are as published in Windom’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (9 line items).
Data refreshed September 11, 2026.