17 line items · $117M · starting 2026–2031 · 1 plan
Leesburg's published capital plans list 17 water, sewer and wastewater line items with a combined planning budget of $117M, of which 7 items worth $89M sit in the wastewater and sewer departments. The largest single item is Water Pollution Control Facility Nutrient & Liquid Processing Improvements at $53M (2026–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Pollution Control Facility Nutrient & Liquid Processing Improvements | Wastewater | Nutrient removal | $53M | 2026–2031 |
| 2 | Water Pollution Control Facility Solids Processing Improvements | Wastewater | Biosolids, sludge and dewatering | $20M | 2027 |
| 3 | Automated Water Meter Reading and Meter Technology System Upgrade | Water Distribution | Meters and AMI | $8M | 2027 |
| 4 | Utilities Repair, Replacement, and Rehabilitation (3-R) | Wastewater | Pump stations | $6M | 2026–2031 |
| 5 | Water Treatment Plant Residuals Treatment and Disposal Upgrade | Water Supply | Water treatment plants | $6M | 2029–2031 |
| 6 | Townwide Water Line Improvements and Repairs | Water Distribution | Water mains and distribution | $5M | 2026–2031 |
| 7 | Sanitary Sewer Pump Station Upgrades | Sewer | Pump stations | $4M | 2029–2031 |
| 8 | Townwide Sanitary Sewer Improvements and Repairs | Sewer | Sewer rehabilitation and I&I | $3M | 2026–2031 |
| 9 | Microsoft Data Center Related Improvements | Water Distribution | Sewer rehabilitation and I&I | $2M | 2026–2027 |
| 10 | Water Storage Tank Recoating at Hogback Tank | Water Supply | Storage tanks and reservoirs | $2M | 2027 |
7 more line items in Leesburg, with descriptions and contacts
Klarifi holds every Leesburg line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$74M
9 items
2027
$30M
3 items
2029
$12M
4 items
2031
$1M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 5 | $82M | 70% |
| Sewer | 2 | $7M | 6% |
| Water Supply | 7 | $14M | 12% |
| Water Distribution | 3 | $15M | 13% |
1 publicly owned treatment plant in Leesburg. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Elysian Heights STP | — | VA0092380 | 0 |
Sources and methodology
Budgets and years are as published in Leesburg’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2031 (17 line items).
Data refreshed September 11, 2026.