37 line items · $85M · starting 2026–2029 · 1 plan
Warrenton's published capital plans list 37 water, sewer and wastewater line items with a combined planning budget of $85M, of which 18 items worth $41M sit in the wastewater and sewer departments. The largest single item is High Rate Filter, Sediment & Flocc at $15M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | High Rate Filter, Sediment & Flocc | Water Supply | Membranes and filtration | $15M | 2025–2029 |
| 2 | Secondary Clarifier and Sludge Pump | Wastewater | Biosolids, sludge and dewatering | $11M | 2026–2027 |
| 3 | Warrenton Reservoir Dam | Water Supply | Storage tanks and reservoirs | $9M | 2025–2031 |
| 4 | Headworks Building | Wastewater | Headworks, screening and grit | $8M | 2028–2030 |
| 5 | WTP Clearwell Project | Water Supply | Water treatment plants | $7M | 2027–2028 |
| 6 | Primary Digester | Wastewater | Anaerobic digesters and biogas | $6M | 2026–2027 |
| 7 | Taylor Pump Station | Sewer | Pump stations | $5M | 2026–2028 |
| 8 | Cedar Run Pump Station | Sewer | Pump stations | $5M | 2026–2029 |
| 9 | Water Line Improvements: LRCC | Water Distribution | Water mains and distribution | $4M | 2029–2030 |
| 10 | Lee Highway Waterline Replacement | Water Distribution | Water mains and distribution | $2M | 2026–2029 |
27 more line items in Warrenton, with descriptions and contacts
Klarifi holds every Warrenton line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$31M
18 items
2026
$30M
6 items
2027
$8M
6 items
2028
$10M
4 items
2029
$6M
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 11 | $28M | 33% |
| Sewer | 7 | $14M | 16% |
| Water Supply | 12 | $34M | 40% |
| Water Distribution | 7 | $10M | 12% |
1 publicly owned treatment plant in Warrenton. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Vint Hill Farm Station | 0.29 | VA0020460 | 0 |
Sources and methodology
Budgets and years are as published in Warrenton’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2031 (37 line items).
Data refreshed September 11, 2026.