Winchester, Virginia: water and wastewater capital improvement projects

7 line items · $42M · starting 2026 · 1 plan

Winchester's published capital plans list 7 water, sewer and wastewater line items with a combined planning budget of $42M, of which 7 items worth $42M sit in the wastewater and sewer departments. The largest single item is Water Transmission Line at $17M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Winchester

The 7 largest water, sewer and wastewater line items in Winchester’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water Transmission LineSewerWater mains and distribution$17M2025–2026
2Jefferson Street Water Pump StationSewerPump stations$10M2026
3Sewer Pump Station ReplacementSewerPump stations$6M2025
4Raw Water Pump Station UpgradeSewerPump stations$3M2025–2026
5Water Intake ImprovementsSewer$3M2026
6Wastewater Treatment Plant ImprovementsWastewaterWastewater treatment plant upgrades$2M2025–2026
7Maintenance BuildingSewerBuildings, HVAC and site work$1M2025

Descriptions, page references and contacts for Winchester

Klarifi holds every Winchester line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$29M

5 items

2026

$13M

2 items

By department

Line items and planning budgets by department, Winchester.
DepartmentLine itemsBudgetShare
Wastewater1$2M5%
Sewer6$40M95%

Wastewater treatment plants in Winchester

2 publicly owned treatment plants in Winchester with 46 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Parkins Mills Wastewater Treat1.96VAL07519143
Indian Hollow Elementary School0.003VA00719273

Other Virginia cities with capital plans

Winchester capital plan questions

Sources and methodology

Budgets and years are as published in Winchester’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2026 (7 line items).

Data refreshed September 11, 2026.