33 line items · $14M · starting 2026–2031 · 1 plan
Woodstock's published capital plans list 33 water, sewer and wastewater line items with a combined planning budget of $14M, of which 15 items worth $833K sit in the wastewater and sewer departments. The largest single item is West End Line at $6M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | West End Line | Water Distribution | — | $6M | 2026 |
| 2 | West End Dam | Water Supply | — | $2M | 2031 |
| 3 | Hisey Avenue Water Line Extension | Water Distribution | Water mains and distribution | $2M | 2028 |
| 4 | Water Well Development | Water Supply | Wells and groundwater | $1M | 2027–2028 |
| 5 | Electrical Upgrade | Water Supply | Generators, power and electrical | $517K | 2027 |
| 6 | Sedimentation Basin Repairs | Water Supply | Clarifiers and settling | $429K | 2026 |
| 7 | Hisey Avenue Extension | Water Distribution | Water mains and distribution | $200K | 2026 |
| 8 | Muhlenberg Townes Waterline Upgrades | Water Distribution | Water mains and distribution | $155K | 2026 |
| 9 | Potable Water Line Installation | Water Distribution | Water mains and distribution | $148K | 2030 |
| 10 | Fleet Replacement #11 | Sewer | Vehicles and equipment | $135K | 2026 |
23 more line items in Woodstock, with descriptions and contacts
Klarifi holds every Woodstock line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$7M
14 items
2027
$2M
8 items
2028
$2M
6 items
2029
$232K
3 items
2030
$148K
1 items
2031
$2M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 12 | $537K | 4% |
| Sewer | 3 | $295K | 2% |
| Water Supply | 11 | $5M | 34% |
| Water Distribution | 7 | $8M | 60% |
1 publicly owned treatment plant in Woodstock with 26 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Woodstock STP | 0.5 | VA0026468 | 26 |
Sources and methodology
Budgets and years are as published in Woodstock’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (33 line items).