Klarifi Logo
Try for freeLog in
Klarifi Logo

UV disinfection: wastewater treatment plants in Missouri

311 plants · 46% of the state · 371 MGD reported by 298 plants

Klarifi identifies 311 publicly owned wastewater treatment plants with uv disinfection in Missouri, 46% of the 671 plants in the state (371 MGD reported by 298 plants). The largest is Metropolitan St. Louis Sewer District Lemay WWTP in St. Louis at 105.45 MGD.

Ultraviolet disinfection destroys pathogens in the final effluent without chemicals or a chlorine residual. It has replaced chlorine at many plants since the 2000s and needs lamp, ballast and sleeve replacement on a fixed cycle, which keeps these plants in the market for UV suppliers.

UV disinfection plants nationwide →All plants in Missouri →Largest plants in Missouri →

The largest plants with UV disinfection in Missouri

The 10 largest plants with uv disinfection in Missouri by average flow, with permit expiry and three-year violation count.
#FacilityCityAvg flow (MGD)NPDES permitExpiresViolations (3y)
1Metropolitan St. Louis Sewer District Lemay WWTPSt. Louis105.45MO0025151Aug 20316
2Little Blue Valley Sewer DistrictIndependence39.13MOL101087Dec 203014
3St. Joseph Water Protection FacilitySaint Joseph20.69MO0023043Nov 20254
4Joplin Turkey Creek WWTPJoplin9.49MO0103349Sep 202265
5O' Fallon Wastewater Treatment PlantO'Fallon7.55MO0028720Sep 20310
6Jefferson City RwrfJefferson City7.03MO0094846Mar 20250
7Shoal Creek Wastewater Treatment FacilityJoplin5.66MO0023256Mar 202311
8St Peters PwsSaint Peters5.65MO0030970Dec 20240
9Cape Girardeau WWTPCape Girardeau5.39MO0136328Jun 20240
10Springfield NW WWTPSpringfield5MO0103039Jul 20250

Plants planning uv disinfection upgrades

These plants report uv disinfection as a planned process in the EPA Clean Watersheds Needs Survey: the earliest public signal of a project.

Missouri plants with uv disinfection recorded as a planned process.
FacilityCityAvg flow (MGD)NPDES permitExpires
Kirksville WWTPKirksville2.71MO0049506Dec 2027
Bismarck PwsBismarck2.33MO0022942Mar 2031
Harrisonville PwsHarrisonville1.2MO0028070May 2027
Parma Pws-Parma - Treatment PlantParma1.1MO0039900Oct 2027
Eldon WWTPEldon0.85MO0100676Dec 2024
Cabool WWTFCabool0.83MO0026301Dec 2021
Monroe City WWTPMonroe City0.44MO0055379Mar 2024
Higginsville South WWTFHigginsville0.42MO0023108Sep 2027
Wellsville PwsWellsville0.39MO0050695Dec 2023
Windsor Southwest WWTFWindsor0.37MO0047325Mar 2026

Contacts and project signals for every plant on this list

Klarifi adds verified decision-maker contacts, permit limits, discharge monitoring data and the capital projects planned in each city, filterable by technology, size and compliance record.

Start a free trialKlarifi Plus: done-for-you outreach for this segment →

Other technologies in Missouri

UV disinfection in Missouri: questions

Sources and methodology

Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.

Data refreshed October 26, 2026.

Wastewater terms: Tertiary treatment · Ozonation · WWTP · Inflow and infiltration · Sludge dewatering · all terms

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free