Activated sludge and clarifiers: wastewater treatment plants in Missouri

97 plants · 16% of the state · 418 MGD reported by 92 plants

Klarifi identifies 97 publicly owned wastewater treatment plants with activated sludge and clarifiers in Missouri, 16% of the 593 plants in the state (418 MGD reported by 92 plants). The largest is Metropolitan St. Louis Sewer District Bissell Point WWTP in St. Louis at 90.1 MGD.

Activated sludge is the standard mechanical process for cities: aeration basins where bacteria consume organic matter, followed by clarifiers that settle the biomass out. These plants are identified by their circular or rectangular clarifiers and by the suspended-growth process code, and they are the main market for blowers, diffusers, clarifier mechanisms and instrumentation.

Activated sludge and clarifiers plants nationwide →All plants in MissouriLargest plants in Missouri

The largest activated sludge plants in Missouri

The 25 largest plants with activated sludge and clarifiers in Missouri by average flow, with permit expiry and three-year violation count.
#FacilityCityAvg flow (MGD)NPDES permitExpiresViolations (3y)
1Metropolitan St. Louis Sewer District Bissell Point WWTPSt. Louis90.1MO0025178Aug 203114
2Metropolitan St. Louis Sewer District Lemay WWTPSt. Louis79.3MO0025151Aug 20310
3Little Blue Valley Sewer DistrictIndependence29.2MOL101087Dec 203014
4Southwest WWTPSpringfield25.32MO0049522Jul 20250
5St. Joseph Water Protection FacilitySaint Joseph18.27MO0023043Nov 20254
6MSD Coldwater WWTPFlorissant14.3MO0025160Aug 20311
7Kc, Westside WWTPKansas City12.54MO0024929Jun 20262
8Metropolitan St Louis Sewer District-Grand Glaize Wastewater Treatment PlantValley Park10.4MO0101362Aug 20310
9MSD Lower Meramec WWTPSt. Louis7.6MO0127949Aug 20310
10O' Fallon Wastewater Treatment PlantO'Fallon6.7MO0028720Mar 20250
11Joplin Turkey Creek WWTPJoplin5.7MO0103349Sep 202264
12Shoal Creek Wastewater Treatment FacilityJoplin5.6MO0023256Mar 20239
13Jefferson City RwrfJefferson City5.36MO0094846Mar 20250
14Rock Creek Waste TreatmentIndependence5.07MO0089681Mar 202412
15St Peters PwsSaint Peters4.83MO0030970Dec 20240
16Wentzville PwsWentzville4.34MO0093599Mar 20244
17Dcsd Wastewater Treatment Plant 2Weldon Spring4.28MO0116572Dec 20250
18Springfield NW WWTPSpringfield4.06MO0103039Jul 20250
19Duckett Creek Sanitation District Treatment Plant #1Saint Charles4.04MO0085472Jun 20210
20St Charles Missouri River WWTPSt. Charles3.73MO0058351Sep 20250
21MSD Fenton Waste Water Treatment PlantFenton3.6MO0086126Dec 20220
22Blue Springs, Sni A Bar WWTFGrain Valley3.5MO0028886Nov 202816
23Carthage WWTPCarthage2.92MO0039136Mar 20234
24Hannibal PwsHannibal2.69MO0093513Apr 20230
25Monett Wastewater Treatment PlantMonett2.5MO0021440Jun 202917

Contacts and project signals for every plant on this list

Klarifi adds verified decision-maker contacts, permit limits, discharge monitoring data and the capital projects planned in each city, filterable by technology, size and compliance record.

Start a free trialKlarifi Plus: done-for-you outreach for this segment →

Other technologies in Missouri

Activated sludge and clarifiers in Missouri: questions

Sources and methodology

Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.

Data refreshed September 11, 2026.