Klarifi Logo
Try for freeLog in
Klarifi Logo

Anaerobic digesters and biogas: wastewater treatment plants in Missouri

26 plants · 4% of the state · 327 MGD reported by 23 plants

Klarifi identifies 26 publicly owned wastewater treatment plants with anaerobic digesters and biogas in Missouri, 4% of the 593 plants in the state (327 MGD reported by 23 plants). The largest is Metropolitan St. Louis Sewer District Bissell Point WWTP in St. Louis at 90.1 MGD.

Anaerobic digesters stabilise sludge in sealed heated tanks and produce biogas, visible from the air as digester silos and gas holders. Plants with digesters are typically above 5 MGD and are the buyers of mixing, heating, gas handling, cogeneration and dewatering equipment.

Anaerobic digesters and biogas plants nationwide →All plants in MissouriLargest plants in Missouri

The largest plants with anaerobic digesters in Missouri

The 25 largest plants with anaerobic digesters and biogas in Missouri by average flow, with permit expiry and three-year violation count.
#FacilityCityAvg flow (MGD)NPDES permitExpiresViolations (3y)
1Metropolitan St. Louis Sewer District Bissell Point WWTPSt. Louis90.1MO0025178Aug 203114
2Metropolitan St. Louis Sewer District Lemay WWTPSt. Louis79.3MO0025151Aug 20310
3Little Blue Valley Sewer DistrictIndependence29.2MOL101087Dec 203014
4Southwest WWTPSpringfield25.32MO0049522Jul 20250
5St. Joseph Water Protection FacilitySaint Joseph18.27MO0023043Nov 20254
6MSD Coldwater WWTPFlorissant14.3MO0025160Aug 20311
7Kc, Westside WWTPKansas City12.54MO0024929Jun 20262
8Metropolitan St Louis Sewer District-Grand Glaize Wastewater Treatment PlantValley Park10.4MO0101362Aug 20310
9MSD Lower Meramec WWTPSt. Louis7.6MO0127949Aug 20310
10O' Fallon Wastewater Treatment PlantO'Fallon6.7MO0028720Mar 20250
11Joplin Turkey Creek WWTPJoplin5.7MO0103349Sep 202264
12Shoal Creek Wastewater Treatment FacilityJoplin5.6MO0023256Mar 20239
13St Peters PwsSaint Peters4.83MO0030970Dec 20240
14Springfield NW WWTPSpringfield4.06MO0103039Jul 20250
15Hannibal PwsHannibal2.69MO0093513Apr 20230
16Branson Compton Drive WWTPBranson2.26MO0025241Sep 20241
17Sikeston WWTPSikeston2.23MO0035009Sep 20250
18Washington WWTPWashington1.65MO0025810Mar 20262
19Sedalia Central WWTPSedalia1.28MO0023019Oct 202857
20Moberly WWTPMoberly1.25MO0117960Oct 20246
21Harrisonville PwsHarrisonville0.84MO0028070May 202713
22Carrollton WWTPCarrollton0.48MO0096318Mar 203116
23Pcsd No.1 Taylor Hills WWTPWaynesville0.01MO0133302Sep 20240
24Blue River Wastewater Treatment PlantKansas CityMO0024911Mar 20269
25Columbia WWTPColumbiaMO0097837Jun 20257

Contacts and project signals for every plant on this list

Klarifi adds verified decision-maker contacts, permit limits, discharge monitoring data and the capital projects planned in each city, filterable by technology, size and compliance record.

Start a free trialKlarifi Plus: done-for-you outreach for this segment →

Other technologies in Missouri

Anaerobic digesters and biogas in Missouri: questions

Sources and methodology

Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free