City Of Pearland Barry Rose W. W. Treatment Plant
1902 1/2 Barry Rose Road, Pearland, TX 77581 · Brazoria County · Publicly Owned Treatment Works
- Average flow
- 2.85 MGD
- Design flow
- 4.5 MGD
- Permit expires
- April 2030
- Population served
- 21,993
City Of Pearland Barry Rose W. W. Treatment Plant is a publicly owned wastewater treatment works in Pearland, Brazoria County, Texas treating an average of 2.85 million gallons per day against a permitted design capacity of 4.5 MGD, serving about 21,993 residents. It discharges under NPDES permit TX0032735 (effective), which expires in April 2030, with 26 recorded violations in the last three years. EPA has recorded 5 formal enforcement actions naming the plant, the latest in December 2024.
Treatment technology
2 treatment structures and unit processes identified at City Of Pearland Barry Rose W. W. Treatment Plant.
Compliance snapshot (last 3 years)
Based on NPDES Discharge Monitoring Reports. Full violation history, parameters and discharge data available in the Klarifi platform.
- Total violations
- 26
- Effluent violations
- 26
EPA enforcement history
Federal civil enforcement cases, compliance inspections and informal actions recorded for City Of Pearland Barry Rose W. W. Treatment Plant in EPA's ICIS system.
- Formal actions
- 5
- Compliance actions
- $20,100
- EPA inspections
- 1
Latest case
Administrative order · CWA, NPDES Permit Violations · Final Order Issued
“The order was issued to City of Pearland for effluent permit limits. The faciliy is required to submit a compliance plan to eliminate violations.”
Capital improvement projects in Pearland
Pearland's capital improvement plan lists 80 water, sewer and wastewater line items worth $136M starting 2025–2029. The largest budgeted items are shown here.
| Project | Budget | Years |
|---|---|---|
| Barry Rose Gravity Sewer - Plum from Galveston to Barry Rose WRF | $9,780,000 | 2025–2025 |
| Sanitary Sewer Rehabilitation - Longwood Service Area (LW-03) | $8,011,100 | 2025–2025 |
| FM 518 Utility Relocations Phase 2 (Old Chocolate Bayou to McLean) | $6,800,000 | 2026–2026 |
| FM 518 Utility Relocations - SH288 to Old Chocolate Bayou | $6,745,000 | 2025–2025 |
| FM 518 Wastewater Utility Relocations - SH288 to Old Chocolate Bayou | $6,550,000 | 2025–2025 |
Key contacts
9 verified contacts for City Of Pearland Barry Rose W. W. Treatment Plant, with validated emails and direct phone numbers.
Nearby wastewater treatment plants in Texas
- Southeast WWTPHouston · 2 mi away5.99 MGD
- City Of Pearland- Longwood WWTPPearland · 3 mi away1.86 MGD
- Sagemont WWTPHouston · 4 mi away5.63 MGD
- John Hargrove Water Reclamation FacilityPearland · 4 mi away5.04 MGD
- Easthaven WWTPHouston · 5 mi away3.88 MGD
- Brazoria County Mud 3 WWTPPearland · 6 mi away1.43 MGD
- Harris County Wcid 47 WWTPHouston · 6 mi away4.44 MGD
- Southdown Wastewater Treatment FacilityPearland · 6 mi away0.7 MGD
City Of Pearland Barry Rose W. W. Treatment Plant: frequently asked questions
What is the address of City Of Pearland Barry Rose W. W. Treatment Plant?
The address on the plant’s EPA facility record is 1902 1/2 Barry Rose Road, Pearland, TX 77581, in Brazoria County. Its coordinates are 29.5734, -95.2609. For some plants the record holds the utility’s mailing address rather than the plant gate.
How much wastewater does City Of Pearland Barry Rose W. W. Treatment Plant treat?
City Of Pearland Barry Rose W. W. Treatment Plant treats an average of 2.85 MGD and is permitted for a design flow of 4.5 MGD.
Has City Of Pearland Barry Rose W. W. Treatment Plant been subject to EPA enforcement action?
EPA's enforcement records list 5 formal civil enforcement cases naming City Of Pearland Barry Rose W. W. Treatment Plant, 1 since fiscal year 2020. The latest case reached its current status in December 2024 (administrative order, final order issued). The full case history, with milestones, violation types and EPA's case summaries, is shown in Klarifi with a free account.
What treatment technology does City Of Pearland Barry Rose W. W. Treatment Plant use?
Klarifi has identified 2 treatment structures and unit processes at the Pearland facility. The full treatment train, with exact unit counts, is shown in Klarifi with a free account.
What is the NPDES permit for City Of Pearland Barry Rose W. W. Treatment Plant?
The facility discharges under NPDES permit TX0032735, currently effective, expiring April 2030.
Is City Of Pearland Barry Rose W. W. Treatment Plant in compliance?
Discharge monitoring reports show 26 violations at City Of Pearland Barry Rose W. W. Treatment Plant in the last three years, 26 of them effluent limit exceedances. The full history is available in Klarifi.
Are there capital improvement projects planned in Pearland, TX?
Yes. Pearland's capital improvement plan lists 80 water, sewer and wastewater projects worth $136M starting between 2025 and 2029. Line items and the people behind them are in Klarifi.
Who operates City Of Pearland Barry Rose W. W. Treatment Plant and how do I contact them?
City Of Pearland Barry Rose W. W. Treatment Plant is a publicly owned treatment works in Pearland, Texas. Klarifi lists 9 verified decision-maker contacts for this facility, available with a free trial.