Klarifi Logo
Try for freeLog in
Klarifi Logo

City Of Pearland Barry Rose W. W. Treatment Plant

Pearland, TX · Brazoria County · Publicly Owned Treatment Works

Average flow
3.89 MGD
Design flow
4.5 MGD
NPDES permit
TX0032735
Effective
Permit expires
April 2030
Population served
21,993
CWNS 2022

City Of Pearland Barry Rose W. W. Treatment Plant is a publicly owned wastewater treatment works in Pearland, Brazoria County, Texas treating an average of 3.89 million gallons per day against a permitted design capacity of 4.5 MGD, serving about 21,993 residents. Treatment on site includes clarifiers, uncovered lagoons, carrousels / oxidation ditches. It discharges under NPDES permit TX0032735 (effective), which expires in April 2030, with 28 recorded violations in the last three years.

Treatment technology

Treatment structures identified at this facility. Exact unit counts are available in Klarifi.

Clarifiers

Unlock

Uncovered lagoons

Unlock

Carrousels / oxidation ditches

Unlock

Unlock exact unit counts →

Compliance snapshot (last 3 years)

Total violations
28
Effluent violations
28

Based on NPDES Discharge Monitoring Reports. Full violation history, parameters and discharge data available in the Klarifi platform.

Capital improvement projects in Pearland

Pearland's capital improvement plan lists 80 water, sewer and wastewater line items worth $136M starting 2025–2029. The largest budgeted items are shown here.

All water and sewer capital projects in Pearland

ProjectBudgetYears
Barry Rose Gravity Sewer - Plum from Galveston to Barry Rose WRF$9,780,0002025–2025
Sanitary Sewer Rehabilitation - Longwood Service Area (LW-03)$8,011,1002025–2025
FM 518 Utility Relocations Phase 2 (Old Chocolate Bayou to McLean)$6,800,0002026–2026
FM 518 Utility Relocations - SH288 to Old Chocolate Bayou$6,745,0002025–2025
FM 518 Wastewater Utility Relocations - SH288 to Old Chocolate Bayou$6,550,0002025–2025

Full project details — scope, funding source, engineering consultant and the decision-makers behind each project — are available in Klarifi, along with similar wastewater capital projects in other cities.

See full project details

Find similar projects in other cities →

Key contacts

9 verified contacts for City Of Pearland Barry Rose W. W. Treatment Plant, with validated emails and direct phone numbers.

Unlock 9 verified contacts (6 more than shown)

Names, validated emails and direct phone numbers for decision-makers at City Of Pearland Barry Rose W. W. Treatment Plant, plus the full compliance history and discharge data.

Try Klarifi free

Nearby wastewater treatment plants in Texas

Southeast WWTP

Houston · 2 mi away

7.24 MGD

City Of Pearland- Longwood WWTP

Pearland · 3 mi away

1.81 MGD

Sagemont WWTP

Houston · 4 mi away

6.41 MGD

3.98 MGD

Easthaven WWTP

Houston · 5 mi away

4.47 MGD

Brazoria County Mud 3 WWTP

Pearland · 6 mi away

1.5 MGD

Harris County Wcid 47 WWTP

Houston · 6 mi away

5.07 MGD

0.56 MGD

City Of Pearland Barry Rose W. W. Treatment Plant: frequently asked questions

Sources and methodology

Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.

Data refreshed September 11, 2026; facility record last updated May 29, 2025.


Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free