2727 Dixie Farm Road, Pearland, TX 77581 · Brazoria County · Publicly Owned Treatment Works
City Of Pearland- Longwood WWTP is a publicly owned wastewater treatment works in Pearland, Brazoria County, Texas treating an average of 1.88 million gallons per day against a permitted design capacity of 2.5 MGD, serving about 41,106 residents. It discharges under NPDES permit TX0032743 (effective), which expires in May 2028, with 23 recorded violations in the last three years. EPA has recorded 1 formal enforcement action naming the plant, the latest in March 2024.
One treatment structure or unit process identified at City Of Pearland- Longwood WWTP.
Available with a free Klarifi account
See the full treatment train at City Of Pearland- Longwood WWTP: structures, unit processes and planned upgrades, with exact unit counts.
Based on NPDES Discharge Monitoring Reports. Full violation history, parameters and discharge data available in the Klarifi platform.
Federal civil enforcement cases, compliance inspections and informal actions recorded for City Of Pearland- Longwood WWTP in EPA's ICIS system.
Latest case · Mar 2024
City of Pearland TX0032743
Administrative order · CWA, NPDES Permit Violations · Final Order Issued · Compliance actions $4,000
EPA's description of the case:
“City of Pearland was issued an Administrative Order for effluent violations of the TPDES permit. The City is required to submit a corrective action plan within 30 days.”
Source: EPA ECHO, civil enforcement case 06-2024-1736.
Full case history with a free Klarifi account
Every action against City Of Pearland- Longwood WWTP with dates, milestones, violation types and EPA's complete case summaries, plus inspections and informal actions.
Pearland's capital improvement plan lists 80 water, sewer and wastewater line items worth $136M starting 2025–2029. The largest budgeted items are shown here.
All water and sewer capital projects in Pearland →
| Project | Budget | Years |
|---|---|---|
| Barry Rose Gravity Sewer - Plum from Galveston to Barry Rose WRF | $9,780,000 | 2025–2025 |
| Sanitary Sewer Rehabilitation - Longwood Service Area (LW-03) | $8,011,100 | 2025–2025 |
| FM 518 Utility Relocations Phase 2 (Old Chocolate Bayou to McLean) | $6,800,000 | 2026–2026 |
| FM 518 Utility Relocations - SH288 to Old Chocolate Bayou | $6,745,000 | 2025–2025 |
| FM 518 Wastewater Utility Relocations - SH288 to Old Chocolate Bayou | $6,550,000 | 2025–2025 |
Full project details — scope, funding source, engineering consultant and the decision-makers behind each project — are available in Klarifi, along with similar wastewater capital projects in other cities.
9 verified contacts for City Of Pearland- Longwood WWTP, with validated emails and direct phone numbers.
Unlock 9 verified contacts (6 more than shown)
Names, validated emails and direct phone numbers for decision-makers at City Of Pearland- Longwood WWTP, plus the full compliance history and discharge data.
Houston · 3 mi away
5.64 MGD
Pearland · 3 mi away
2.89 MGD
Houston · 3 mi away
6.01 MGD
Houston · 4 mi away
2.36 MGD
Houston · 5 mi away
9.87 MGD
Pearland · 6 mi away
5.2 MGD
Houston · 6 mi away
4.49 MGD
Houston · 7 mi away
3.92 MGD
Sources and methodology
Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.
Data refreshed October 26, 2026; facility record last updated September 30, 2026.
Wastewater terms: POTW · MGD · NPDES permit · Inflow and infiltration · Lift station · Sludge dewatering · all terms