80 line items · $136M · starting 2026–2029 · 1 plan
Pearland's published capital plans list 80 water, sewer and wastewater line items with a combined planning budget of $136M, of which 45 items worth $80M sit in the wastewater and sewer departments. The largest single item is Barry Rose Gravity Sewer - Plum from Galveston to Barry Rose WRF at $10M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Barry Rose Gravity Sewer - Plum from Galveston to Barry Rose WRF | Wastewater | Wastewater treatment plant upgrades | $10M | 2025 |
| 2 | Sanitary Sewer Rehabilitation - Longwood Service Area (LW-03) | Wastewater | Sewer rehabilitation and I&I | $8M | 2025 |
| 3 | FM 518 Utility Relocations Phase 2 (Old Chocolate Bayou to McLean) | Wastewater | Sewer rehabilitation and I&I | $7M | 2026 |
| 4 | FM 518 Utility Relocations - SH288 to Old Chocolate Bayou | Water Supply | Water mains and distribution | $7M | 2025 |
| 5 | FM 518 Wastewater Utility Relocations - SH288 to Old Chocolate Bayou | Wastewater | Sewer rehabilitation and I&I | $7M | 2025 |
| 6 | Creekview and Shadycrest Transite Pipe Water Line Replacement | Water Distribution | Water mains and distribution | $6M | 2025 |
| 7 | Wood Creek Transite Pipe Water Line Replacement | Water Distribution | Water mains and distribution | $5M | 2025 |
| 8 | Shady Crest and Creek View Subdivision Sanitary Sewer Rehabilitation | Wastewater | Sewer rehabilitation and I&I | $5M | 2025 |
| 9 | Sanitary Sewer Rehabilitation - Longwood Service Area (LW-04) | Wastewater | Sewer rehabilitation and I&I | $4M | 2025–2026 |
| 10 | Cullen Ground Storage Tank Replacement | Water Supply | Storage tanks and reservoirs | $4M | 2025 |
70 more line items in Pearland, with descriptions and contacts
Klarifi holds every Pearland line item with its description, the page it appears on and the source document, plus 44 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$85M
49 items
2026
$24M
13 items
2027
$15M
10 items
2028
$5M
3 items
2029
$7M
5 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 45 | $80M | 58% |
| Water Supply | 19 | $28M | 20% |
| Water Distribution | 16 | $29M | 21% |
6 publicly owned treatment plants in Pearland with 264 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Reflection Bay Water Reclamation Facility | 6.1 | TX0117501 | 74 |
| John Hargrove Water Reclamation Facility | 3.98 | TX0116581 | 85 |
| City Of Pearland Barry Rose W. W. Treatment Plant | 3.89 | TX0032735 | 28 |
| City Of Pearland- Longwood WWTP | 1.81 | TX0032743 | 23 |
| Brazoria County Mud 3 WWTP | 1.5 | TX0086118 | 14 |
| Southdown Wastewater Treatment Facility | 0.56 | TX0085383 | 40 |
Sources and methodology
Budgets and years are as published in Pearland’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (80 line items).