Arlington, Texas: water and wastewater capital improvement projects

9 line items · $238M · 1 plan

Arlington's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $238M, of which 1 items worth $74M sit in the wastewater and sewer departments. The largest single item is Water and Sewer Main at $74M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Arlington

The 9 largest water, sewer and wastewater line items in Arlington’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water and Sewer MainSewerSewer rehabilitation and I&I$74M2025–2028
2Water TreatmentWater SupplyWater treatment plants$52M2025–2028
3Residential Rebuilds w/Public WorksWater Supply$28M2025–2028
4Joint Drainage Projects w/Public WorksWater SupplyStormwater and flood resilience$21M2025–2028
5Elevated Storage TankWater SupplyStorage tanks and reservoirs$20M2025–2028
6Joint Arterial Street Rebuild w/Public WorksWater DistributionWater mains and distribution$19M2025–2028
7Water OperationsWater Supply$15M2025–2028
8Meter InfrastructureWater DistributionMeters and AMI$7M2025–2028
9Technology and EquipmentWater SupplyVehicles and equipment$2M2025–2028

Descriptions, page references and contacts for Arlington

Klarifi holds every Arlington line item with its description, the page it appears on and the source document, plus 15 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$238M

9 items

By department

Line items and planning budgets by department, Arlington.
DepartmentLine itemsBudgetShare
Sewer1$74M31%
Water Supply6$138M58%
Water Distribution2$26M11%

Wastewater treatment plants in Arlington

1 publicly owned treatment plant in Arlington with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Village Creek Reclamation Facility142TX00472953

Other Texas cities with capital plans

Arlington capital plan questions

Sources and methodology

Budgets and years are as published in Arlington’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: Adopted Budget 2025 (9 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free