48 line items · $208M · starting 2026–2031 · 1 plan
Conroe's published capital plans list 48 water, sewer and wastewater line items with a combined planning budget of $208M, of which 19 items worth $76M sit in the wastewater and sewer departments. The largest single item is Wastewater Treatment Plant Expansion - Conroe Central at $15M (2029–2033). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Wastewater Treatment Plant Expansion - Conroe Central | Wastewater | Wastewater treatment plant upgrades | $15M | 2029–2033 |
| 2 | Water Plant - Wedgewod Point | Water Supply | Water treatment plants | $13M | 2030–2034 |
| 3 | Water Plant #33 - Longmire Road League Line | Water Supply | Water treatment plants | $12M | 2024–2025 |
| 4 | Water Plant - E. Wally Wilkerson Parkway and FM 1484 | Water Distribution | Water treatment plants | $10M | 2029–2030 |
| 5 | Water Plant #34 - East SH 242 Area | Water Supply | Water treatment plants | $9M | 2025–2027 |
| 6 | Water Well Re-Drilling and Control Building - Plant #5 | Water Supply | Wells and groundwater | $8M | 2025–2027 |
| 7 | Water Line Extension - FM 1484 | Water Distribution | Water mains and distribution | $7M | 2026–2027 |
| 8 | Trunk Line Replacement - Alligator Creek | Sewer | Force mains and interceptors | $6M | 2028–2030 |
| 9 | Water Well Re-Drilling - Plant #15 | Water Supply | Wells and groundwater | $6M | 2028–2029 |
| 10 | Water Well Re-Drilling - Plant #7 | Water Supply | Wells and groundwater | $6M | 2027–2028 |
38 more line items in Conroe, with descriptions and contacts
Klarifi holds every Conroe line item with its description, the page it appears on and the source document, plus 11 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$100M
24 items
2026
$32M
9 items
2027
$12M
4 items
2028
$19M
5 items
2029
$27M
3 items
2030
$14M
2 items
2031
$4M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 2 | $17M | 8% |
| Sewer | 17 | $59M | 28% |
| Water Supply | 12 | $76M | 36% |
| Water Distribution | 17 | $57M | 27% |
17 publicly owned treatment plants in Conroe with 111 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Conroe Southwest Regional WWTP | 9.4 | TX0022268 | 9 |
| Conroe Central WWTP | 3.54 | TX0138274 | 9 |
| River Plantation Mud WWTF | 1.77 | TX0025674 | 2 |
| San Jacinto River Authority | 0.73 | TX0063461 | 0 |
| Montgomery County Mud 15 WWTP | 0.66 | TX0022055 | 1 |
| Montgomery County Mud 18 WWTF | 0.66 | TX0100331 | 8 |
| Valley Ranch WWTP | 0.34 | TX0127710 | 1 |
| Montgomery County Mud 157 WWTP 1 | 0.31 | TX0138011 | 6 |
| Montgomery County Mud 112 WWTP | 0.28 | TX0128431 | 3 |
| Panorama Village Wastewater Treatment Facility | 0.23 | TX0020206 | 5 |
| Chateau Woods Municipal Utility | 0.16 | TX0090123 | 2 |
| Corinthian Point Mud 2 - WWTP | 0.11 | TX0027049 | 1 |
| Texas National Mud | 0.11 | TX0068659 | 5 |
| Lazy River Improvement District WWTF | 0.05 | TX0069256 | 2 |
| Moorehead Jr High School WWTP | 0.02 | TX0138932 | 4 |
| Stonebrooke Sections 1 And 2 | 0.02 | TX0142000 | 51 |
| Stephen F Austin Elementary WWTP | 0.01 | TX0083216 | 2 |
Sources and methodology
Budgets and years are as published in Conroe’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2034 (48 line items).
Data refreshed September 11, 2026.