Klarifi Logo
Try for freeLog in
Klarifi Logo

Corpus Christi, Texas: water and wastewater capital improvement projects

110 line items · $3.4B · starting 2026–2031 · 1 plan

Corpus Christi's published capital plans list 110 water, sewer and wastewater line items with a combined planning budget of $3.4B, of which 37 items worth $1.1B sit in the wastewater and sewer departments. The largest single item is Seawater Desalination (Inner Harbor Plant) at $641M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Corpus Christi

The 10 largest water, sewer and wastewater line items in Corpus Christi’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Seawater Desalination (Inner Harbor Plant)Water SupplyPlanning, studies and asset management$641M2025–2027
2City-Wide Wastewater ID/IQWastewaterBiosolids, sludge and dewatering$222M2025–2034
3City-Wide Water Line Repair/Replacement - Large DiameterWater DistributionWater mains and distribution$160M2025–2034
4City-Wide Water Line Repair/Replacement - Small DiameterWater DistributionWater mains and distribution$160M2025–2034
5City-Wide Collection Capacity RemediationWastewaterSewer rehabilitation and I&I$108M2025–2033
6Seawater Desalination Inner Harbor PlantWater Supply$105M2028
7Oso WRP Process Upgrade & BPC Facility DecommissionWastewaterWastewater treatment plant upgrades$98M2025–2028
8ONSWTP Third Treatment TrainWater SupplyWater treatment plants$97M2027–2029
9Water Utility Support - Streets projectsWater Supply$91M2025–2034
10Wastewater support for Street projectsWastewater$87M2025–2034

100 more line items in Corpus Christi, with descriptions and contacts

Klarifi holds every Corpus Christi line item with its description, the page it appears on and the source document, plus 48 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$2.3B

59 items

2026

$168M

8 items

2027

$152M

5 items

2028

$405M

18 items

2029

$72M

4 items

2030

$125M

5 items

2031

$52M

7 items

2032 and later

$69M

4 items

By department

Line items and planning budgets by department, Corpus Christi.
DepartmentLine itemsBudgetShare
Wastewater36$1.1B31%
Sewer1$6M0%
Water Supply43$1.6B46%
Water Distribution30$751M22%

Project types in Corpus Christi's plan

Wastewater treatment plants in Corpus Christi

4 publicly owned treatment plants in Corpus Christi with 32 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Oso WWTP16.32TX00470581
City Of Corpus Christi3.9TXS00060113
Laguna Madre WWTP2.52TX004710415
Whitecap WWTP1.35TXR05AZ203

Other Texas cities with capital plans

Corpus Christi capital plan questions

Sources and methodology

Budgets and years are as published in Corpus Christi’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2027 (110 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free