Baytown, Texas: water and wastewater capital improvement projects

37 line items · $342M · starting 2026–2029 · 1 plan

Baytown's published capital plans list 37 water, sewer and wastewater line items with a combined planning budget of $342M, of which 10 items worth $70M sit in the wastewater and sewer departments. The largest single item is BAWA East Surface Water Plant Phase 2 Expansion at $52M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Baytown

The 10 largest water, sewer and wastewater line items in Baytown’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1BAWA East Surface Water Plant Phase 2 ExpansionWater SupplyWater treatment plants$52M2026
2IH-10 Lift Station #2 Force Main and Gravity System ImprovementsWater DistributionLift stations$36M2025–2027
3Neighborhood Waterline Area- Wooster TerraceWater DistributionWater mains and distribution$29M2029–2030
4IH-10 Lift Station #1 ImprovementsWater DistributionLift stations$21M2025
5Lead Service Line ReplacementWater DistributionLead service line replacement$18M2025–2027
6NE-WWTP Secondary Treatment Improvement ProjectWastewaterAeration and blowers$17M2027–2028
7NE-WWTP Peak Flow Improvements ProjectWastewaterWastewater treatment plant upgrades$16M2026–2027
8Transite Pipe Water Line Replacement Program - BaywayWater DistributionWater mains and distribution$13M2025–2026
9Annual Water Line Rehabilitation ProgramWater DistributionWater mains and distribution$12M2025–2030
10Texas Avenue Lift Station ImprovementsWater DistributionLift stations$11M2025

27 more line items in Baytown, with descriptions and contacts

Klarifi holds every Baytown line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$168M

24 items

2026

$87M

6 items

2027

$40M

4 items

2028

$18M

2 items

2029

$29M

1 items

By department

Line items and planning budgets by department, Baytown.
DepartmentLine itemsBudgetShare
Wastewater7$58M17%
Sewer3$12M4%
Water Supply6$72M21%
Water Distribution21$199M58%

Project types in Baytown's plan

Wastewater treatment plants in Baytown

6 publicly owned treatment plants in Baytown with 111 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Central District Wastewater Treatment Plant4.75TX002010954
West District Wastewater Treatment Plant4.25TX00728344
Northeast District Wastewater Treatment Plant2.03TX01265434
Chambers County District No 1 WWTP0.28TX01283252
Lake Mud WWTP0.19TX012618723
Lake Mud WWTP 20.12TX012772824

Other Texas cities with capital plans

Baytown capital plan questions

Sources and methodology

Budgets and years are as published in Baytown’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2034 (37 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free