Fountain, Colorado: water and wastewater capital improvement projects

14 line items · $2M · starting 2027–2029 · 1 plan

Fountain's published capital plans list 14 water, sewer and wastewater line items with a combined planning budget of $2M. The largest single item is Water Meter Replacements (10% each year) at $970K (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Fountain

The 10 largest water, sewer and wastewater line items in Fountain’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water Meter Replacements (10% each year)Water DistributionMeters and AMI$970K2025–2029
2Blossom Field ImprovementsWater Supply$398K2027–2028
3Loveland Terrace ImprovementsWater Supply$200K2028–2029
4Valve Insertions & Fire HydrantsWater DistributionWater mains and distribution$150K2025–2029
5System Sample PortsWater Supply$108K2027–2029
6WaraWater Supply$100K2025–2029
7Southwest Tank RehabWater SupplyStorage tanks and reservoirs$80K2025
8Tap Saddles & Water ServicesWater Supply$80K2025–2029
9SCADA HardwareWater SupplySCADA, controls and instrumentation$30K2027
10Well #3 CleaningWater SupplyWells and groundwater$30K2029

4 more line items in Fountain, with descriptions and contacts

Klarifi holds every Fountain line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$1M

7 items

2027

$596K

5 items

2028

$200K

1 items

2029

$30K

1 items

By department

Line items and planning budgets by department, Fountain.
DepartmentLine itemsBudgetShare
Water Supply11$1M48%
Water Distribution3$1M52%

Wastewater treatment plants in Fountain

1 publicly owned treatment plant in Fountain with 5 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Harold D Thompson Regional WW Reclamation Facility1.08CO00000055

Other Colorado cities with capital plans

Fountain capital plan questions

Sources and methodology

Budgets and years are as published in Fountain’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (14 line items).

Data refreshed September 11, 2026.