14 line items · $2M · starting 2027–2029 · 1 plan
Fountain's published capital plans list 14 water, sewer and wastewater line items with a combined planning budget of $2M. The largest single item is Water Meter Replacements (10% each year) at $970K (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Meter Replacements (10% each year) | Water Distribution | Meters and AMI | $970K | 2025–2029 |
| 2 | Blossom Field Improvements | Water Supply | — | $398K | 2027–2028 |
| 3 | Loveland Terrace Improvements | Water Supply | — | $200K | 2028–2029 |
| 4 | Valve Insertions & Fire Hydrants | Water Distribution | Water mains and distribution | $150K | 2025–2029 |
| 5 | System Sample Ports | Water Supply | — | $108K | 2027–2029 |
| 6 | Wara | Water Supply | — | $100K | 2025–2029 |
| 7 | Southwest Tank Rehab | Water Supply | Storage tanks and reservoirs | $80K | 2025 |
| 8 | Tap Saddles & Water Services | Water Supply | — | $80K | 2025–2029 |
| 9 | SCADA Hardware | Water Supply | SCADA, controls and instrumentation | $30K | 2027 |
| 10 | Well #3 Cleaning | Water Supply | Wells and groundwater | $30K | 2029 |
4 more line items in Fountain, with descriptions and contacts
Klarifi holds every Fountain line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$1M
7 items
2027
$596K
5 items
2028
$200K
1 items
2029
$30K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Water Supply | 11 | $1M | 48% |
| Water Distribution | 3 | $1M | 52% |
1 publicly owned treatment plant in Fountain with 5 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Harold D Thompson Regional WW Reclamation Facility | 1.08 | CO0000005 | 5 |
Sources and methodology
Budgets and years are as published in Fountain’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (14 line items).
Data refreshed September 11, 2026.