46 line items · $97M · starting 2026–2029 · 1 plan
Loveland's published capital plans list 46 water, sewer and wastewater line items with a combined planning budget of $97M, of which 1 items worth $1M sit in the wastewater and sewer departments. The largest single item is 402 20" water line at $12M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | 402 20" water line | Water Distribution | Water mains and distribution | $12M | 2026–2027 |
| 2 | Service Center Expansion | Water Supply | — | $11M | 2025–2026 |
| 3 | AMI | Water Distribution | Meters and AMI | $10M | 2026–2029 |
| 4 | LCR - Lead Service Line Replacement | Water Distribution | Lead service line replacement | $10M | 2025–2029 |
| 5 | East Gravity Zone 36" Phase 2 South Village (287&402) | Water Distribution | — | $7M | 2025–2026 |
| 6 | 36" Transmission Line Relining | Water Distribution | Water mains and distribution | $6M | 2026–2027 |
| 7 | Taft 18th to 29th w/Stormwater | Water Supply | Stormwater and flood resilience | $4M | 2025 |
| 8 | Water Line Replacement (Namaqua Hills) | Water Distribution | Water mains and distribution | $4M | 2025 |
| 9 | 29th ST Phase 1 - 24" Drycreek to N. Garfield | Water Distribution | — | $3M | 2026–2027 |
| 10 | East Gravity Zone 36" Phase 3 | Water Distribution | — | $3M | 2028–2029 |
36 more line items in Loveland, with descriptions and contacts
Klarifi holds every Loveland line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$46M
19 items
2026
$36M
12 items
2027
$5M
5 items
2028
$7M
7 items
2029
$2M
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 1 | $1M | 1% |
| Water Supply | 17 | $26M | 26% |
| Water Distribution | 28 | $70M | 72% |
No publicly owned treatment plant is recorded under Loveland in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Colorado.
Sources and methodology
Budgets and years are as published in Loveland’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (46 line items).