Loveland, Colorado: water and wastewater capital improvement projects

46 line items · $97M · starting 2026–2029 · 1 plan

Loveland's published capital plans list 46 water, sewer and wastewater line items with a combined planning budget of $97M, of which 1 items worth $1M sit in the wastewater and sewer departments. The largest single item is 402 20" water line at $12M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Loveland

The 10 largest water, sewer and wastewater line items in Loveland’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1402 20" water lineWater DistributionWater mains and distribution$12M2026–2027
2Service Center ExpansionWater Supply$11M2025–2026
3AMIWater DistributionMeters and AMI$10M2026–2029
4LCR - Lead Service Line ReplacementWater DistributionLead service line replacement$10M2025–2029
5East Gravity Zone 36" Phase 2 South Village (287&402)Water Distribution$7M2025–2026
636" Transmission Line ReliningWater DistributionWater mains and distribution$6M2026–2027
7Taft 18th to 29th w/StormwaterWater SupplyStormwater and flood resilience$4M2025
8Water Line Replacement (Namaqua Hills)Water DistributionWater mains and distribution$4M2025
929th ST Phase 1 - 24" Drycreek to N. GarfieldWater Distribution$3M2026–2027
10East Gravity Zone 36" Phase 3Water Distribution$3M2028–2029

36 more line items in Loveland, with descriptions and contacts

Klarifi holds every Loveland line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$46M

19 items

2026

$36M

12 items

2027

$5M

5 items

2028

$7M

7 items

2029

$2M

3 items

By department

Line items and planning budgets by department, Loveland.
DepartmentLine itemsBudgetShare
Sewer1$1M1%
Water Supply17$26M26%
Water Distribution28$70M72%

Project types in Loveland's plan

Wastewater treatment plants in Loveland

No publicly owned treatment plant is recorded under Loveland in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Colorado.

Other Colorado cities with capital plans

Loveland capital plan questions

Sources and methodology

Budgets and years are as published in Loveland’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (46 line items).

Data refreshed September 11, 2026.