Gunnison, Colorado: water and wastewater capital improvement projects

46 line items · $73M · starting 2026–2030 · 1 plan

Gunnison's published capital plans list 46 water, sewer and wastewater line items with a combined planning budget of $73M, of which 21 items worth $9M sit in the wastewater and sewer departments. The largest single item is Water Infrastructure Project 3 – Pump Station, Well Houses, and Water Treatment Plant at $40M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Gunnison

The 10 largest water, sewer and wastewater line items in Gunnison’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water Infrastructure Project 3 – Pump Station, Well Houses, and Water Treatment PlantWater DistributionPump stations$40M2025–2026
2Water Infrastructure Project 5 – Raw Water ReservoirWater DistributionStorage tanks and reservoirs$8M2030
3Water Infrastructure Project 2 – Raw Water and Distribution PipingWater DistributionWater mains and distribution$6M2025–2026
4Water Infrastructure Project 4 – Water Storage TankWater DistributionStorage tanks and reservoirs$4M2025–2027
5Compost Master Plan UpgradesWastewaterPlanning, studies and asset management$3M2025–2028
6Water Infrastructure Project 1 – Infiltration Gallery and WellsWater DistributionMembranes and filtration$3M2025–2026
7Water Treatment Plant DesignWater DistributionWater treatment plants$2M2030
8Pretreatment Grit Removal System/Stop Log ReplacementWastewaterHeadworks, screening and grit$1M2026–2027
9Gravity Thickener Mechanism ReplacementWastewaterBiosolids, sludge and dewatering$825K2028–2030
10Headworks and RAS Gallery Motor Control Center (MCC) ReplacementWastewaterHeadworks, screening and grit$650K2027–2029

36 more line items in Gunnison, with descriptions and contacts

Klarifi holds every Gunnison line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$57M

12 items

2026

$2M

4 items

2027

$865K

3 items

2028

$1M

4 items

2029

$138K

4 items

2030

$12M

19 items

By department

Line items and planning budgets by department, Gunnison.
DepartmentLine itemsBudgetShare
Wastewater19$8M11%
Sewer2$363K0%
Water Supply16$1M2%
Water Distribution9$64M87%

Project types in Gunnison's plan

Wastewater treatment plants in Gunnison

No publicly owned treatment plant is recorded under Gunnison in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Colorado.

Other Colorado cities with capital plans

Gunnison capital plan questions

Sources and methodology

Budgets and years are as published in Gunnison’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (46 line items).

Data refreshed September 11, 2026.