26 line items · $125M · starting 2026–2029 · 1 plan
Englewood's published capital plans list 26 water, sewer and wastewater line items with a combined planning budget of $125M, of which 5 items worth $41M sit in the wastewater and sewer departments. The largest single item is SPR CIP Budget (50/50) (WIFIA/Cash) 41 30002-002 at $37M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | SPR CIP Budget (50/50) (WIFIA/Cash) 41 30002-002 | Sewer | — | $37M | 2025–2029 |
| 2 | Lead Reduction SRF 40 30023-003 | Water Supply | — | $27M | 2025–2026 |
| 3 | City Ditch Piping Project (Cash) 40 30001-002 | Water Supply | Pump stations | $11M | 2025–2026 |
| 4 | Pump Station Improvements (Program) (WIFIA) 40 30003-003 | Water Supply | Pump stations | $10M | 2025–2029 |
| 5 | Water Supply Projects (Program) (Cash) 40 30022-002 | Water Supply | Planning, studies and asset management | $6M | 2027–2029 |
| 6 | Allen WTP Process Improvements (WIFIA) 40 30002-002 | Water Supply | Water treatment plants | $6M | 2026–2028 |
| 7 | Annual Waterline Replacement - Construction (Cash) 40 30004-003 | Water Distribution | Water mains and distribution | $5M | 2026–2029 |
| 8 | Lead Reduction Program Manager (WIFIA/ARPA) 40 30017-002 | Water Supply | Lead service line replacement | $3M | 2025–2026 |
| 9 | Sewer Pipe and Manhole Rehab (Cash) 41 30001-003 | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2029 |
| 10 | Allen WTP Space Improvements Phase II - Construction (WIFIA) 40 30011-003 | Water Supply | Water treatment plants | $2M | 2025 |
16 more line items in Englewood, with descriptions and contacts
Klarifi holds every Englewood line item with its description, the page it appears on and the source document, plus 7 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$106M
20 items
2026
$12M
3 items
2027
$6M
1 items
2029
$393K
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 5 | $41M | 33% |
| Water Supply | 19 | $78M | 63% |
| Water Distribution | 2 | $5M | 4% |
2 publicly owned treatment plants in Englewood. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Arapahoe County Water And Waste Water Authority | 2.53 | COE015000 | 0 |
| Spring Valley Ranch WWTF | — | CO0046965 | 0 |
Sources and methodology
Budgets and years are as published in Englewood’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (26 line items).
Data refreshed September 11, 2026.