91 line items · $450M · starting 2026–2028 · 1 plan
Greeley's published capital plans list 91 water, sewer and wastewater line items with a combined planning budget of $450M, of which 25 items worth $119M sit in the wastewater and sewer departments. The largest single item is WTRF Primary Treatment Phase 2 at $45M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | WTRF Primary Treatment Phase 2 | Sewer | Clarifiers and settling | $45M | 2024–2025 |
| 2 | Terry Ranch Water Development | Water Distribution | — | $38M | 2024–2028 |
| 3 | Future Water Acquisition - Phase II | Water Distribution | — | $36M | 2024–2028 |
| 4 | Non-Potable Waterline | Water Distribution | Water mains and distribution | $23M | 2024–2028 |
| 5 | Bellvue Pipeline-Gold Hill Segment | Water Distribution | Water mains and distribution | $22M | 2024–2027 |
| 6 | Water and Sewer Facilities Program | Water Distribution | Sewer rehabilitation and I&I | $19M | 2024–2027 |
| 7 | Lead Service Line Inventory and Replacement | Water Distribution | Lead service line replacement | $17M | 2024–2025 |
| 8 | Non-Potable Expansion Project | Water Distribution | Water reuse and reclaimed water | $15M | 2024–2028 |
| 9 | Lift Station 9 | Sewer | Lift stations | $12M | 2026–2028 |
| 10 | Secondary Clarifier Upgrades | Sewer | Clarifiers and settling | $12M | 2026–2028 |
81 more line items in Greeley, with descriptions and contacts
Klarifi holds every Greeley line item with its description, the page it appears on and the source document, plus 46 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$379M
72 items
2026
$52M
13 items
2027
$17M
4 items
2028
$1M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 25 | $119M | 27% |
| Water Supply | 5 | $7M | 2% |
| Water Distribution | 61 | $323M | 72% |
2 publicly owned treatment plants in Greeley with 18 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Greeley WWTP | 9.4 | COL040258 | 13 |
| Hill-N-Park STP | 1.79 | CO0047287 | 5 |
Sources and methodology
Budgets and years are as published in Greeley’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2028 (91 line items).
Data refreshed September 11, 2026.