46 line items · $73M · starting 2026–2030 · 1 plan
Gunnison County's published capital plans list 46 water, sewer and wastewater line items with a combined planning budget of $73M, of which 21 items worth $9M sit in the wastewater and sewer departments. The largest single item is Water Infrastructure Project 3 – Pump Station, Well Houses, and Water Treatment Plant at $40M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Infrastructure Project 3 – Pump Station, Well Houses, and Water Treatment Plant | Water Distribution | Pump stations | $40M | 2025–2026 |
| 2 | Water Infrastructure Project 5 – Raw Water Reservoir | Water Distribution | Storage tanks and reservoirs | $8M | 2030 |
| 3 | Water Infrastructure Project 2 – Raw Water and Distribution Piping | Water Distribution | Water mains and distribution | $6M | 2025–2026 |
| 4 | Water Infrastructure Project 4 – Water Storage Tank | Water Distribution | Storage tanks and reservoirs | $4M | 2025–2027 |
| 5 | Compost Master Plan Upgrades | Wastewater | Planning, studies and asset management | $3M | 2025–2028 |
| 6 | Water Infrastructure Project 1 – Infiltration Gallery and Wells | Water Distribution | Membranes and filtration | $3M | 2025–2026 |
| 7 | Water Treatment Plant Design | Water Distribution | Water treatment plants | $2M | 2030 |
| 8 | Pretreatment Grit Removal System/Stop Log Replacement | Wastewater | Headworks, screening and grit | $1M | 2026–2027 |
| 9 | Gravity Thickener Mechanism Replacement | Wastewater | Biosolids, sludge and dewatering | $825K | 2028–2030 |
| 10 | Headworks and RAS Gallery Motor Control Center (MCC) Replacement | Wastewater | Headworks, screening and grit | $650K | 2027–2029 |
36 more line items in Gunnison County, with descriptions and contacts
Klarifi holds every Gunnison County line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$57M
12 items
2026
$2M
4 items
2027
$865K
3 items
2028
$1M
4 items
2029
$138K
4 items
2030
$12M
19 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 19 | $8M | 11% |
| Sewer | 2 | $363K | 0% |
| Water Supply | 16 | $1M | 2% |
| Water Distribution | 9 | $64M | 87% |
No publicly owned treatment plant is recorded under Gunnison County in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Colorado.
Sources and methodology
Budgets and years are as published in Gunnison County’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (46 line items).