38 line items · $14M · starting 2026–2029 · 1 plan
Steamboat Springs's published capital plans list 38 water, sewer and wastewater line items with a combined planning budget of $14M, of which 21 items worth $7M sit in the wastewater and sewer departments. The largest single item is Solids Handling Operational Improvements (Buildng/Conveyor System then Replace Belt Filter Press) at $2M (2028–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Solids Handling Operational Improvements (Buildng/Conveyor System then Replace Belt Filter Press) | Wastewater | Biosolids, sludge and dewatering | $2M | 2028–2029 |
| 2 | Franklin Rd. Water Main-W. Silver to Cemetery | Water Distribution | Water mains and distribution | $1M | 2028 |
| 3 | Mound Street | Water Distribution | Water mains and distribution | $871K | 2029 |
| 4 | Pleasant St. Water Main | Water Distribution | Water mains and distribution | $817K | 2027 |
| 5 | WWTP Aeration Improvements | Wastewater | Aeration and blowers | $765K | 2025–2026 |
| 6 | Cedar/Crescent | Sewer | — | $724K | 2026 |
| 7 | 2014 Kenworth Jet-Vac | Wastewater | Vehicles and equipment | $550K | 2025 |
| 8 | Colonial Park West Sanitary Sewer Realignment | Sewer | Sewer rehabilitation and I&I | $485K | 2029 |
| 9 | Crestview WM Replacement (Oak to Ridge) | Water Distribution | — | $450K | 2025 |
| 10 | Hallie Court/Cardinal Drive | Water Distribution | Water mains and distribution | $421K | 2029 |
28 more line items in Steamboat Springs, with descriptions and contacts
Klarifi holds every Steamboat Springs line item with its description, the page it appears on and the source document, plus 16 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$4M
15 items
2026
$2M
10 items
2027
$2M
5 items
2028
$3M
4 items
2029
$2M
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 8 | $4M | 29% |
| Sewer | 13 | $3M | 23% |
| Water Supply | 3 | $1M | 8% |
| Water Distribution | 14 | $6M | 41% |
2 publicly owned treatment plants in Steamboat Springs with 34 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Steamboat Springs WWTP | 2.22 | CO0020834 | 27 |
| Steamboat Lake Wsd | 0.03 | CO0035556 | 7 |
Sources and methodology
Budgets and years are as published in Steamboat Springs’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (38 line items).
Data refreshed September 11, 2026.