Steamboat Springs, Colorado: water and wastewater capital improvement projects

38 line items · $14M · starting 2026–2029 · 1 plan

Steamboat Springs's published capital plans list 38 water, sewer and wastewater line items with a combined planning budget of $14M, of which 21 items worth $7M sit in the wastewater and sewer departments. The largest single item is Solids Handling Operational Improvements (Buildng/Conveyor System then Replace Belt Filter Press) at $2M (2028–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Steamboat Springs

The 10 largest water, sewer and wastewater line items in Steamboat Springs’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Solids Handling Operational Improvements (Buildng/Conveyor System then Replace Belt Filter Press)WastewaterBiosolids, sludge and dewatering$2M2028–2029
2Franklin Rd. Water Main-W. Silver to CemeteryWater DistributionWater mains and distribution$1M2028
3Mound StreetWater DistributionWater mains and distribution$871K2029
4Pleasant St. Water MainWater DistributionWater mains and distribution$817K2027
5WWTP Aeration ImprovementsWastewaterAeration and blowers$765K2025–2026
6Cedar/CrescentSewer$724K2026
72014 Kenworth Jet-VacWastewaterVehicles and equipment$550K2025
8Colonial Park West Sanitary Sewer RealignmentSewerSewer rehabilitation and I&I$485K2029
9Crestview WM Replacement (Oak to Ridge)Water Distribution$450K2025
10Hallie Court/Cardinal DriveWater DistributionWater mains and distribution$421K2029

28 more line items in Steamboat Springs, with descriptions and contacts

Klarifi holds every Steamboat Springs line item with its description, the page it appears on and the source document, plus 16 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$4M

15 items

2026

$2M

10 items

2027

$2M

5 items

2028

$3M

4 items

2029

$2M

4 items

By department

Line items and planning budgets by department, Steamboat Springs.
DepartmentLine itemsBudgetShare
Wastewater8$4M29%
Sewer13$3M23%
Water Supply3$1M8%
Water Distribution14$6M41%

Wastewater treatment plants in Steamboat Springs

2 publicly owned treatment plants in Steamboat Springs with 34 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Steamboat Springs WWTP2.22CO002083427
Steamboat Lake Wsd0.03CO00355567

Other Colorado cities with capital plans

Steamboat Springs capital plan questions

Sources and methodology

Budgets and years are as published in Steamboat Springs’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (38 line items).

Data refreshed September 11, 2026.